My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Site/field investigation efforts will be completed in four(4) days. <br /> 11. HDR Team members anticipated to attend the field inspections include: <br /> a) BC Lead (1 days) <br /> b) Project Engineer (3 days) <br /> c) Drone Inspector (2 days) <br /> d) Senior Technical Advisor (2 days) <br /> e) Structural Engineer(1 days) <br /> f) Process Mechanical Engineer (1 days) <br /> Deliverables <br /> 1. Workshop/meeting agenda and minutes (PDF format). <br /> 2. Draft Condition Assessment Plan (PDF format). <br /> 3. Final Condition Assessment Plan (PDF format). <br /> 4. Draft Condition Assessment TM (PDF format). <br /> 5. Final Condition Assessment TM (PDF format). <br /> Subtask 402 - Site Condition Assessment <br /> Objective <br /> Assess the PGSF site regarding site stability, internal drainage systems, and water quality <br /> needs. Document findings to serve as inputs to the project identification and prioritization <br /> process. <br /> Consultant Services <br /> 1. Review available record drawings to prepare for field inspections. <br /> 2. Conduct field assessment of site civil infrastructure. <br /> 3. Identify deficiencies with regards to performance and/or code compliance. <br /> 4. Conduct visual inspection of existing site security with operations staff and identify <br /> improvement needs. <br /> 5. Prepare a final Site Condition Assessment TM. <br /> 6. Conduct a workshop/review meeting of results with the City. <br /> Client Responsibilities <br /> 1. Provide record drawings and historical site documentation and information. <br /> 2. Provide documentation of site conditions with regard to contamination. <br /> 3. Provide an escort and access to the site and systems. <br /> 4. Provide special provisions and training for site safety requirements. <br /> 5. Provide review comments for the Draft Site Condition Assessment TM. <br /> City of Everett—Port Gardner Storage Facility 14 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.