My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EN <br /> 9. Develop preliminary seismic loadings based on existing geotechnical information. <br /> 10. Review available record drawings. <br /> 11. Develop preliminary seismic design ground motion parameters for the seismic analysis <br /> based on existing soil information. <br /> 12. Provide an assessment of liquefaction, liquefaction-induced settlement and lateral <br /> spreading to the extent possible with existing soil information. <br /> 13. Construct Finite Element Models for the structures identified to undergo the Seismic <br /> Resiliency Evaluation. <br /> 14. Analyze the structural models for applicable current codes loadings and guidelines and <br /> based on the South Whidbey Island design seismic event. <br /> 15. Identify conceptual methods to mitigate the impacts of the design seismic event. <br /> 16. Provide a Draft TM reporting deficiencies and recommendation for retrofitting. <br /> 17. Present report/finding to the City in a workshop setting. <br /> 18. Finalize report addressing City Comments <br /> 19. Prepare a final Seismic Infrastructure Resiliency Assessment TM. <br /> Client Responsibilities <br /> 1. Provide review comments for Climate Change and Sea Level Resilience Assessment <br /> TM. <br /> 2. Provide review comments for Infrastructure Resilience Assessment TM. <br /> Assumptions <br /> 1. Geotechnical evaluations will be performed based on existing available information. <br /> 2. Inundation evaluation does not include coastal flooding conditions resulting from storm <br /> surge, wind set-up, wave run-up or high tide in combination with pluvial flooding. <br /> 3. Changes in l&I resulting from climate change and potential consequences of extreme <br /> conditions will be in the collection system modeling <br /> 4. ASCE 41 requirements and guidelines will not be used for this task. <br /> 5. The 7.4M South Whidbey Island Fault (SWIF) event will be used to assess the structural <br /> resiliency on the structures and the site piping. A 7.4M SWIF event has a 2%chance of <br /> occurring over the next 50 years (1 in 2,475-year event) <br /> Deliverables <br /> 1. Draft and Final Climate Change and Sea Level Resiliency Assessment TM (PDF <br /> format). <br /> 2. Draft and Final Seismic Infrastructure Resiliency Assessment TM (PDF format). <br /> City of Everett—Port Gardner Storage Facility 16 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.