My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FYR <br /> Task 500 — Cost Estimation <br /> Task Objective <br /> Develop an OPCC estimates for selected alternative projects. <br /> Consultant Services <br /> 1. Prepare and provide AACE opinions of probable construction costs for the facility or <br /> conveyance alternatives in previous tasks. <br /> 2. Provide Basis of Estimate TMs for the PGSF and another one for the conveyance <br /> system improvements. <br /> 3. Conduct two (2) workshops/meetings for development of the estimating approach and <br /> review. <br /> Client Responsibilities <br /> 1. Provide historical "soft" cost information. <br /> 2. Provide review comments for cost estimates. <br /> 3. Participate in workshop/meetings. <br /> Assumptions <br /> 1. The OPCCs will generally provide the range of accuracy defined in AACE International <br /> Recommended Practice No. 17R-97, <br /> a) Class 4—Study/Feasibility Estimate,+50%to -30% Range of Accuracy. <br /> b) Class 5—Conceptual Screening Estimate,+100%to -50% Range of Accuracy. <br /> 2. Cost estimates for the Port Gardner facility will be prepared using standard CSI Master <br /> Format Div. 50 format. <br /> 3. Costs estimates for conveyance system improvements will be in unit prices that could <br /> adapt to unit price contracts in Washington State Department of Transportation <br /> (WSDOT) format. <br /> 4. A maximum of two (2) workshops/meetings will be held for the estimating approach and <br /> review. Duration of the meetings is four(4) hours each. Up to three (3) staff will attend <br /> each meeting. <br /> Deliverables <br /> 1. Workshop/meeting agenda and minutes. <br /> 2. Basis of estimate memorandum documenting the estimate development and sources of <br /> costs. <br /> City of Everett—Port Gardner Storage Facility 19 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.