My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables <br /> 1. Draft and Final of the PGSF General Sewer Plan (PDF and Word formats). <br /> 2. Responses to review comments (PDF format). <br /> 3. Final General Sewer Plan (five stamped copies, one copy PDF format with stamped <br /> page, and original electronic format). <br /> Task 700 — Permitting and Environmental Compliance <br /> Task Objective <br /> Assist the City in developing a strategy for permit acquisition efforts to meet their project <br /> schedule. The project area includes the Port Gardner Storage Facility site and other supporting <br /> facilities that may be located at off-site locations. <br /> Subtask 701 - Ecology Coordination and NPDES Permit Planning <br /> Objective <br /> Assist the City in defining the NPDES discharge permit requirements associated with the Deep <br /> Water Outfall. The intent will be to gain concurrence from Ecology that at a minimum the City <br /> will be permitted to discharge stormwater flows and combined sewer flows in excess of the one <br /> event per year to the DWO. <br /> Consultant Services <br /> 1. Summarize potential discharge options from the PGSF to the DWO. <br /> 2. Meet with the City in advance of meeting with Ecology to review the City's strategy for <br /> the use of the DWO. <br /> 3. Attend up to two (2) meetings with Ecology to present the Port Gardner Storage Facility <br /> and discuss NPDES permitting options for the DWO. <br /> 4. Provide presentation materials at the Ecology meetings. <br /> Client Responsibilities <br /> 1. Coordinate with Department of Ecology. <br /> Assumptions <br /> 1. A maximum of three (3) meetings will be held with the City and Ecology. Duration of the <br /> meetings is four (4) hours each. Up to three (3) staff will attend each meeting. <br /> Deliverables <br /> 1. Meeting presentation materials (PDF and Powerpoint format). <br /> City of Everett—Port Gardner Storage Facility 21 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.