TranTech Engineering LLC 4/15/2020 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
TranTech Engineering LLC 4/15/2020 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:29 AM
Creation date
4/22/2020 9:51:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
4/15/2020
Council Approval Date
4/1/2020
End Date
12/31/2023
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Seismic Retrofit Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001812
Total Compensation
$32,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 5/15/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A - SCOPE OF WORK <br /> Maple Heights Bridge Seismic Retrofit Project - <br /> Construction Phase Engineering Services <br /> This scope of work provides construction phase engineering services for Maple Heights Bridge <br /> Seismic Retrofit(PROJECT) for the City of Everett(CITY)by TranTech Engineering, LLC <br /> (CONSULTANT). <br /> Introduction <br /> The CITY of Everett(CITY)has retained TranTech Engineering, LLC (CONSULTANT)to <br /> provide a complete PS&E package for the Maple Heights Bridge Seismic Retrofit(PROJECT) in <br /> Everett, Washington. The following describes the Scope of Work(SCOPE) for this project. <br /> The Maple Heights Bridge was constructed in 1979 in an area of King City that is now the south <br /> end of the City of Everett and just north of the City of Mukilteo. The 3-span bridge is <br /> approximately 51 feet wide out-to-out and 303 feet long (97.5':110':95.5'). Its superstructure is <br /> composed of reinforced concrete pre-stressed girders made composite with a 7.5"thick concrete <br /> deck slab. Its substructure is composed of concrete abutments and multi-column intermediate <br /> piers founded on shallow spread footing foundations. At both abutments, elastomeric pad <br /> bearings are supporting the superstructure and is utilized as part of the bridge's expansion joint <br /> system on its west abutment. The bridge carries two lanes of traffic with a 5' wide sidewalk on <br /> each side. <br /> The CITY reserves the right to eliminate any task or parts of tasks during the performance of the <br /> contact work. <br /> The individual tasks to be completed by the CONSULTANT are as follows: <br /> Work Element 1 Project Management <br /> This Task includes administration of the contract between the CONSULTANT and the CITY, <br /> preparation of progress reports for the PROJECT. It also includes all administrative services <br /> needed to coordinate with the sub-CONSULTANT(s) and to monitor the PROJECT for scope, <br /> schedule, budget, and quality. The following are the categorized activities associated with this <br /> Task: <br /> 1. Progress Reports and Invoicing-progress reports will contain a narrative that <br /> identifies and describes significant activities performed in the previous period and <br /> significant upcoming activities along with the monthly invoice; <br /> 2. Team Management- management of scope, schedule,budget,quality; and <br /> 3. Management of Sub-consultants. <br /> Page 1 <br /> City of Everett Maple Heights Bridge Retrofit <br />