My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 4/15/2020 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
TranTech Engineering LLC 4/15/2020 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:29 AM
Creation date
4/22/2020 9:51:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
4/15/2020
Council Approval Date
4/1/2020
End Date
12/31/2023
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Seismic Retrofit Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001812
Total Compensation
$32,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 5/15/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Change Orders (COs): At the CITY's request, the CONSULTANT may be asked to <br /> provide assistance to the CITY in reviewing change order proposals, preparing <br /> independent change order cost estimate, and developing required information for COs. <br /> Work may include preparation of drawings and supporting information. This task assumes <br /> that five(5) COs will be prepared. <br /> G. Load Rating of the Retrofitted Bridge: The CONSULTANT will perform an inventory <br /> load rating calculations for the structure after work is completed and prepare a load rating <br /> report in the Load Resistance Factor Rating (LRFR) in accordance with the current <br /> WSDOT Bridge Design Manual and AASHTO Manual of Bridge Evaluation. <br /> H. Inspection of the Retrofitted Bridge: Bridge inspection by a lead inspector and data input <br /> to Bridge Works <br /> I. Record Drawings: The CONSULTANT shall prepare record drawings at the completion <br /> of the project. The CITY will provide Contractor-prepared marked-up drawings, <br /> inspector's field notes, and other available information. The CONSULTANT shall use <br /> these materials to prepare the record drawings. Record drawings shall be prepared in <br /> accordance with the CITY's "Record Drawing Requirements." <br /> Deliverables: <br /> 1. Shop drawing and material submittal reviews. <br /> 2. Responses to RFIs. <br /> 3. Drawings, calculations, and specifications required for change orders. <br /> 4. Load rating report and calculations. <br /> 5. 22"*34"Record Drawings in bond paper <br /> Page 13 <br /> City of Everett Maple Heights Bridge Retrofit <br />
The URL can be used to link to this page
Your browser does not support the video tag.