My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 10:57:27 AM
Creation date
4/22/2020 10:57:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Force Main Condition Assessment/Redundancy
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001468
Total Compensation
$187,172.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Group 11/2/2018
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prepare draft Engineers opinion of construction costs. The draft cost estimate will be <br /> submitted along with the 100% bid-set documents. <br /> • Prepare final bid-set documents, final cost estimate and responses to City review <br /> comments. <br /> This task assumes no coordination meetings/review meetings are anticipated outside of the <br /> already scheduled bi-weekly PM meetings covered within Subtask 8.1. Refer to Table 2 for <br /> Jacobs schedule on a subtask level. <br /> Deliverables: <br /> • 100% bid-set documents and draft cost estimate <br /> • Final bid-set documents, final cost estimate and responses to City review comments <br /> Subtask 8.3 SR08 Pipeline - New Manhole Structure - <br /> Final Design <br /> Utilizing the information from the recently completed SR08 Rehab Pipeline evaluation (Phase <br /> 1), Jacobs will continue to advance design of a new Manhole structure on SR08. Plans and <br /> specifications that will be submitted using the remaining budget in the contract (under Subtask <br /> 7.4) represent 60% design level. (A formal 90% submittal will not be provided; however salient <br /> design items will be discussed during the bi-weekly calls.)The City anticipates that the plan <br /> should be to place a 12 foot diameter precast saddle manhole (or square/rectangular vault) on <br /> the SR08 pipe. The saddle manhole will have a 48" diameter riser section and precast rings. <br /> Specific activities include: <br /> • Prepare 100% bid-set documents (design plans and specifications), per Tables 3 and <br /> 4. (As stated above, only one bid-set package will be developed for this SOW.) <br /> • Prepare draft Engineers opinion of construction costs. The draft cost estimate will be <br /> submitted along with the 100% bid-set documents. <br /> • Prepare final bid-set documents, final cost estimate and responses to City review <br /> comments. <br /> This task assumes no coordination meetings/review meetings are anticipated outside of the <br /> already scheduled bi-weekly PM meetings covered within Subtask 8.1. Refer to Table 2 for <br /> Jacobs schedule on a subtask level. <br /> Deliverables: <br /> • 100% bid-set documents and draft cost estimate,to be provided concurrently with <br /> the 100% deliverables per Subtask 8.2. <br /> • Final bid-set documents, final cost estimate and responses to City review comments. <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.