My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 41 <br /> 2020 Biosolids Removal UT3705-11 <br /> waives and is stopped from seekingadjustment of Contract Sum or Contract Time where Contractor <br /> PP an J <br /> fails to keep and maintain cost,timekeeping,and scheduling records segregated and contemporaneously <br /> allocated to the subject work for which an adjustment is sought. For example,failure to keep <br /> contemporaneous labor and equipment time records specifically and only allocated to each item of <br /> claimed Extra Work shall constitute a waiver of any Contract Claim for reimbursement or additional <br /> Contract Time for each such item of Extra Work. The Contractor shall permit the Owner access to these <br /> and any other records needed for evaluating requests for additional Contract Time or Contract Sum. <br /> 11. DIFFERING SITE CONDITIONS <br /> Upon discovery and before such conditions are disturbed,the Contractor shall promptly provide Notice to <br /> the Owner's Representative of: <br /> 1. Preexisting subsurface or latent physical conditions at the Site differing materially from those <br /> indicated in this Contract, or <br /> 2. Preexisting unknown physical conditions at the Site, of an unusual nature,differing materially <br /> from those ordinarily encountered and generally recognized as inhering in Work of the character <br /> provided for in this Contract. <br /> 111 The Owner's Representative will promptly investigate the conditions. If the Owner's Representative <br /> finds that conditions are materially different and cause a material increase or decrease in the Contractor's <br /> cost of performance of the Work, or extends the duration of the critical path of the schedule,the Owner's <br /> ' Representative will make an adjustment of Contract Sum or Contract Time. <br /> Extensions of Contract Time will be evaluated in accordance with 5.2.2.2 Extensions of Contract Time. <br /> However, if the parties are unable to agree on an adjustment of Contract Sum or Contract Time,the <br /> Owner's Representative will determine the amount of the adjustment of Contract Sum or Contract Time. <br /> If the Owner's Representative determines that differing Site conditions do not exist or that no adjustment <br /> ' in Contract Sum or Contract Time is warranted, such determination shall be final. If there is a decrease in <br /> the costs or time required to perform the Work,failure of the Contractor to notify the Owner's <br /> Representative of the differing Site condition shall not affect the Owner's right to make an adjustment in <br /> the Contract Sum or Contract Time. Additionally,no Contract Claim or adjustment of Contract Sum or <br /> Contract Time shall be allowed unless the Contractor has followed the procedures provided for in this <br /> Contract, including,but not limited to,furnishing timely Notice of the event and its effect on Contract <br /> Time and Contract Sum as required herein. <br /> 12. CONTRACT CLAIMS <br /> 12.1 GENERAL <br /> If the Contractor requests or believes for any reason that additional compensation or an extension of <br /> Contract Time is due it, including,but not limited to,breach of contract or request for adjustment of <br /> Contract Sum or Contract Time,or if the Contractor has a Dispute with the Owner and wants the Owner <br /> to take some action, or refrain from taking action,the Contractor shall file a Contract Claim as provided <br /> in this section. A timely and complete Contract Claim is a condition precedent to any entitlement by the <br /> ' Contractor to an adjustment of Contract Sum or Contract Time. No Contract Claim shall be allowed <br /> unless the Contractor has given Notice as required by this section. The Contractor waives any Contract <br /> Claim if: (a)Notice was not timely given; (b)the Owner's Representative is not afforded reasonable <br /> access by the Contractor to complete records, including,but not limited to,correspondence,job diaries, <br /> and actual cost and additional time incurred; (c)a Contract Claim is not timely filed as required by the <br /> General Conditions; or(d)adequate,accurate,contemporaneous and segregated supporting time and <br /> ' expense records are not kept and maintained. The fact that the Contractor provided proper and timely <br /> Notice,provided a properly filed Contract Claim, or provided the Owner's Representative access to <br /> records of actual cost, shall not in any way be construed as proving or substantiating the validity of the <br /> 1 00 7200 - 41 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.