My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 4 <br /> 2020 Biosolids Removal UT3705-11 <br /> or grade, or modified in such references. All work shall conform to the standard <br /> referred to, except as modified in these specifications and the drawings. 111 <br /> 1.10 CONTRACTOR'S USE OF PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of <br /> products under this Contract. <br /> B. The Contractor shall obtain and pay for use of additional parking, storage or work <br /> areas needed for his/her operations. <br /> 1.11 CHECKING PLANS AND SPECIFICATIONS <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies , <br /> or omissions in the plans and/or specifications to the Architect for a decision prior <br /> to the Submission of Bids. I <br /> B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and <br /> the specifications in regard to materials, equipment, sizes, numbers or locations, <br /> the Owner shall be the sole judge in resolving the conflict. <br /> END OF SECTION 01 1100 <br /> 1 <br /> 01 1100 - 4 SUMMARY OF WORK <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.