Laserfiche WebLink
ON Stevens WTP Sludge Removal Project <br /> Corpus Christi, TX111 <br /> Dates: March - August 2017 & November 2017 - March 2018 <br /> Contract Value: <br /> • 2018: 18,400 dry tons <br /> • 2017: 18,643 dry tons <br /> These projects were to dredge, dewater and haul water treatment alum sludge <br /> from lagoon #7. In the first contract in 2017, we assisted the city in the tie in of <br /> the permanent transformer located near the lagoons, were responsible for the <br /> subcontractor who was on site for the removal of the cattails from the pond I <br /> before the dredging operations commenced, we dredged over 18,400 dry tons of <br /> material from the lagoon. In the second contract we removed an additional <br /> 18,643 dry tons from lagoon #7. Both projects were contracted directly by the <br /> City of Corpus Christi, and LNV was the engineering firm on the project. <br /> Contact: Ian Clements I <br /> Project Engineer <br /> LNV Inc. <br /> Phone: (512) 381-8333 <br /> Email: ilements@Invinc.com <br /> Stanwood Biosolids Removal from Pond No.1 and Pond No. 2 , <br /> Stanwood, WA <br /> Dates: May 2017 - July 2017 <br /> Owner: City of Stanwood I <br /> This project consisted of dredging and dewatering of 760 dry tons of municipal <br /> biosolids from two ponds. The biosolids were dewatered, transported and land <br /> applied to agricultural fields in the Arlington, WA area. <br /> Contact: Shawn Smith <br /> City Engineer/Asst. Public Works Director <br /> City of Stanwood <br /> 10220 270th Street NW <br /> Stanwood, WA 98292 <br /> Phone: 360-629-9781 ext. 9 1 <br /> Email: shawn.smith@ci.stanwood.wa.us <br /> I <br /> 1 <br /> L- <br /> i ). City of Everett 2020 Biosolids Removal Project—Work Order#UT 3705-11 March 6,2020 - Page 6 <br />