Laserfiche WebLink
I <br /> I <br /> I <br /> Elk River WWTP Lagoon Cleaning <br /> I Eureka, CA <br /> Dates: March - April 2017 <br /> IAPG successfully removed 900 dry tons by means of a remote dredge. We were <br /> also responsible for the dewatering, hauling and disposal of the dewatered <br /> solids. <br /> I <br /> Contact: Kelly Allen <br /> City of Eureka, CA <br /> IPhone: (702) 268-5253 <br /> Email: kallen@ci.eureka.ca.gov <br /> I <br /> Marysville WWF Biosolids Removal and Land Application Project <br /> I Marysville, WA <br /> Dates: April 2016 - June 2016 <br /> IThis project included dredging and dewatering of 8,000 dry tons of municipal <br /> biosolids. The biosolids are dewatered, and then transported 180 miles to the <br /> largest Beneficial Use Facility in the state and land applied on large dry land <br /> Iwheat fields. The project was completed in less time than expected and the <br /> client was very satisfied with results. <br /> IContact: Adam Benton <br /> Project Engineer <br /> I City of Marysville, WA <br /> Phone: 360-363-8283 <br /> Email: abenton@marysvillewa.gov <br /> I <br /> City of Calgary Shepard Lagoons Dredging - Calgary, Alberta <br /> IAPG completed pumping and dredging of 6,200 - 8,800 dry tonnes of biosolids <br /> from Shepard Lagoons annually from 2011 - 2016. Solids were dewatered and <br /> transported to disposal and beneficial reuse locations. Solids were pumped 200 <br /> I - 300 meters during project. <br /> Owner: City of Calgary <br /> I Completed: June to October of each year <br /> Contact: Catalina Nadeau-Bonilla <br /> Leader, Operational Performance 403-268-3890 <br /> i <br /> ;' City of Everett 2020 Blosollde Removal Project-Work Order BUT 3705-11 Mardi 6,2020 - Page 7 <br />