Laserfiche WebLink
PUBLIC WORKS <br /> calculations based on a 3-story building. Please coordinate with the owner and architect <br /> to obtain the correct number of fixtures/stories to re-evaluate the necessary utility sized. <br /> Update plans accordingly if larger service sizes are required. <br /> c. I've marked up the note near the fire hydrant since it seems to be shown on two different <br /> sheets. The changes I have made allows the note to be kept on both sheets, but still <br /> present accurate information. <br /> d. Keep the required Everett notes that are currently shown on the plans but also add in the <br /> required sewer notes from section 6-3.1 on page 6-2 of Volume 1 of the City's Design <br /> and Construction Standards and Specifications for Development manual. <br /> 3. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments, please contact Arnie Roshak with the City of Everett <br /> Public Works Department(425-257-7249 or ARoshak@everettwa.gov). <br /> a. Provide a 3-ft setback from the new building to prevent pedestrians from walking into <br /> the filter swale. <br /> b. The grass filter swale shall be provided with a 6" perforated underdrain, cleanout, and <br /> low permeability liner. The neighboring property to the south (assisted living facility) <br /> has a basement and infiltration will not be allowed (filtration only). Infiltration is <br /> additionally not allowed within 10' of a property line or structures per City of Everett's <br /> 2010 SWMM, Volume III, Chapter 2.11. <br /> c. See plans for additional redlined comments. <br /> d. See City of Everett's 2010 SWMM, Volume III, Chapter 2.7 for liner requirements. <br /> Page 2 o2 <br />