My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
222 W CASINO RD 2020-05-06
>
Address Records
>
W CASINO RD
>
222
>
222 W CASINO RD 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 8:25:08 AM
Creation date
5/5/2020 2:15:16 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
222
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday,July 30, 2019 4:21 PM <br /> To: 'Scott Connor' <br /> Cc: Keith Stefanson (StefansonKl@mukilteo.wednet.edu);Tony Lee <br /> Subject: RE: Permit no. B1906-015 - Questions for First Building Review <br /> Scott, <br /> I've reviewed the drawings with the responses and supporting documentation. There are a couple of items that need to <br /> be addressed. They should be simple, so please modify the documents as needed to address the following and bring <br /> hardcopies to our office. <br /> Structural Comments <br /> 1.The statement of special inspections does not address the anchor installation. This shall be provided,such as on <br /> Sheet F1. Inspections shall be specified per IBC Table 1705.7. <br /> 2c. Note 5.8 specifies a strap angle of 40 to 45 degrees. The RADCO report appears to state a minimum angle to <br /> horizontal of 45 degrees, while the Minute Man installation instructions appear to depict a maximum angle of 45- <br /> degrees to horizontal. Please verify the installation limits and modify the detail(s) and notes on Sheet Fl as needed. <br /> 2d.The response did not address the comment,which was about the anchor angle, not the strap angle. Detail 5/F1 <br /> appears to show a vertical installation. The product information indicates a 10-degree installation (from horizontal) <br /> away from the building. The installation instructions also appear to indicate that a stabilizer plate is required. Please <br /> verify the installation requirements for the anchors and specify as needed. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> LiAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: Monday—Friday 7:30am-12:OOpm and 1:OOpm-4:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Scott Connor<scott@scr-arch.com> <br /> Sent: Monday,July 29, 2019 12:27 PM <br /> To: Drew Martin<dmartin@everettwa.gov> <br /> Cc: Keith Stefanson (StefansonKl@mukilteo.wednet.edu) <StefansonKl@mukilteo.wednet.edu>;Tony Lee <br /> <TLee@everettwa.gov> <br /> Subject: RE: Permit no. B1906-015 -Questions for First Building Review <br /> Drew, <br /> I finally got all corrections and responses from structural and wish to resubmit. <br /> I sent you the Revised Permit Set July 24th and there has been no changes what so ever. <br /> 06,2/) <br />
The URL can be used to link to this page
Your browser does not support the video tag.