Laserfiche WebLink
Mr.Randy Heltne <br /> Everett Housing Authority <br /> Plan Check Number: B1807-032, Second Review <br /> October 17, 2018 <br /> 21. No additional comment. <br /> 22. No additional comment. <br /> 23. No additional comment. <br /> 24. No additional comment. <br /> 25. No additional comment. <br /> 26.This comment has not been completely addressed. Section 6/S4.2 has been added in response <br /> to the original comment. See IBC Section 107.2.1. The following comments should be <br /> addressed: <br /> a. The detail on Sheet A-6 should be removed. <br /> b. Sheet A-2 references Detail 5/S4.2 near the middle of the beam. Verify if the reference <br /> should be for Detail 6/S4.2. <br /> c. The nailing requirements for the existing diaphragm sheathing to the nailer should be <br /> specified. <br /> d. Calculations shall be submitted verifying the connection of the Main Level diaphragm to the <br /> beam, including the capacity of the nailer. The nailer connection shall include loads from <br /> the Main Level diaphragm and the shear wall above. The shear loads shall include the 25% <br /> increase per ASCE 7-10 Section 12.3.3.4 Item 2. <br /> e. The beam will act concurrently as a collector transferring shear wall loads from above to <br /> the walls at the south end of the beam. Calculations the combined loading of the beam <br /> shall be submitted for review. The axial component shall include the 25% increase per <br /> ASCE 7-10 Section 12.3.3.4 Item 2. See IBC Sections 1613.1 and 2205.1, and AISC 360-10 <br /> Section H1. <br /> f. The beam shall be connected to the shear walls at the Ground Floor story to transfer lateral <br /> forces from above. A detail for the connection shall be included in the construction <br /> drawings. The detail shall be of sufficient length to develop the load into the shear walls; <br /> the length calculation shall consider reduced available wall capacities due to the direct <br /> transfer of loads from lateral elements above the walls. Calculations substantiating the <br /> connection shall be submitted for review. The axial load shall include the 25% increase per <br /> ASCE 7-10 Section 12.3.3.4 Item 2. <br /> 27. No additional comments. <br /> 28.This comment has not been addressed. The framing plan on Sheet A-7 does not specify in- <br /> plane shear loads for the truss. In addition, details between the truss, the roof sheathing, and <br /> the shear walls are not provided to transfer the loads. Note that page 61 of the structural <br /> calculations indicates that the west side of the building is not subject to increased loads due to <br /> the addition. This assumption is not correct if the roof diaphragm is not provided with a direct <br /> load path at the original east exterior wall of the building to the shear wall below through the <br /> new truss. The original comment is provided below. <br /> Page 8 of 10 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett,WA 98201 • (425) 257-8810 • Fax(425) 257-8 <br />