Laserfiche WebLink
CITY OF EVERETT <br /> WATER FILTRATION PLANT EAST CLEARWELL ROOF REPLACEMENT PROJECT <br /> SUPPLEMENTARY CONDITIONS TO THE DESIGN-BUILD CONTRACT <br /> ARTICLE 1. GENERAL <br /> 1.1 Location <br /> The East Clearwell building is located on the Water Filtration Plant(WFP) property owned by the City <br /> of Everett at the following address: <br /> 6133 Lake Chaplain Rd <br /> Monroe, WA 98294 <br /> 1.2 Definitions <br /> Acceptable Roof System:The roof sheathing, roof support system,and connections to existing <br /> structural components employing acceptable materials for the East Clearwell roof as set forth in <br /> Table 4.2, all in accordance with the Contract Documents including without limitation the Owner's <br /> Project Criteria. <br /> Ancillary Features: Includes the following features for the East Clearwell roof:access hatches, access <br /> ladder and stairs,ventilation systems, and fall protection system, removal and reinstallation of <br /> existing baffle curtain. [NOTE TO PROPOSERS:ADDITIONAL FEATURES, IF ANY, NECESSITATED BY <br /> SELECTED COMPANY'S DESIGN SHALL BE ADDED HERE FOR FINAL DB CONTRACT]. <br /> East Clearwell:The 140 foot by 268 foot structure used to store treated drinking water. <br /> Project:All Work included in the Design-Build Contract including as defined in the General Conditions <br /> and Supplementary Conditions. <br /> Record Drawings: Drawings required by Article 5, Section 5.11.4 of the Supplementary Conditions. <br /> Utility Grade:A level of quality providing the highest degree of reliability, dependability,and durability <br /> available for use in municipal water infrastructure applications. <br /> ARTICLE 2. EXISTING SITE AND FACILITY INFORMATION <br /> 2.1 Existing Site and Facility Information <br /> Design-Builder has been provided access to the documents listed in Table 2.1 below, via transmittal <br /> with the RFP. <br /> Design-Builder may rely on documents included in Table 2.1 only to the extent specifically called out <br /> in that table. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 1 <br />