My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> WATER FILTRATION PLANT EAST CLEARWELL ROOF REPLACEMENT PROJECT <br /> SUPPLEMENTARY CONDITIONS TO THE DESIGN-BUILD CONTRACT <br /> ARTICLE 1. GENERAL <br /> 1.1 Location <br /> The East Clearwell building is located on the Water Filtration Plant(WFP) property owned by the City <br /> of Everett at the following address: <br /> 6133 Lake Chaplain Rd <br /> Monroe, WA 98294 <br /> 1.2 Definitions <br /> Acceptable Roof System:The roof sheathing, roof support system,and connections to existing <br /> structural components employing acceptable materials for the East Clearwell roof as set forth in <br /> Table 4.2, all in accordance with the Contract Documents including without limitation the Owner's <br /> Project Criteria. <br /> Ancillary Features: Includes the following features for the East Clearwell roof:access hatches, access <br /> ladder and stairs,ventilation systems, and fall protection system, removal and reinstallation of <br /> existing baffle curtain. [NOTE TO PROPOSERS:ADDITIONAL FEATURES, IF ANY, NECESSITATED BY <br /> SELECTED COMPANY'S DESIGN SHALL BE ADDED HERE FOR FINAL DB CONTRACT]. <br /> East Clearwell:The 140 foot by 268 foot structure used to store treated drinking water. <br /> Project:All Work included in the Design-Build Contract including as defined in the General Conditions <br /> and Supplementary Conditions. <br /> Record Drawings: Drawings required by Article 5, Section 5.11.4 of the Supplementary Conditions. <br /> Utility Grade:A level of quality providing the highest degree of reliability, dependability,and durability <br /> available for use in municipal water infrastructure applications. <br /> ARTICLE 2. EXISTING SITE AND FACILITY INFORMATION <br /> 2.1 Existing Site and Facility Information <br /> Design-Builder has been provided access to the documents listed in Table 2.1 below, via transmittal <br /> with the RFP. <br /> Design-Builder may rely on documents included in Table 2.1 only to the extent specifically called out <br /> in that table. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.