My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[NOTE TO PROPOSERS: PROPOSERS ARE RESPONSIBLE FOR CONDUCTING ALL FIELD VERIFICATION <br /> AND INSPECTIONS ETC.TO VERIFY INFORMATION AND DEVELOP PROPOSAL PRICING UNLESS <br /> OTHERWISE INDICATED IN TABLE 2.1] <br /> Table 2.1: Existing Site and Facility Information <br /> DOCUMENT DATE EXTENT TO WHICH DESIGN-BUILDER CAN RELY <br /> East Clearwell Related Documents <br /> Record Drawings: 1983 Design-Builder may rely on drawings to ascertain <br /> Water Filtration Facilities Clearwell by general arrangement of facilities and approximate <br /> Gray&Osborne Consulting dimensions.All dimensions of the East Clearwell must <br /> Engineers. be field verified for final confirmation of dimensions <br /> prior to roof fabrication. <br /> In addition, Clearwell Roof Plan and Clearwell Control <br /> Structure drawings(M16-17, M19-21,and S18-20A)) <br /> and Clearwell Structural Drawings(S21-23) may be <br /> relied upon to support structural analysis required <br /> under Article 4,Section 4.4,but such reliance is only <br /> allowed if the structural analysis states specifically <br /> what data from(M16-17 and M19-21)and(S19-23) <br /> the structural analysis relies upon. <br /> Specifications for Water Filtration 1983 Design-Builder may rely on specifications for required <br /> Facilities Clearwell by Gray& concrete strength to support structural analysis <br /> Osborne Consulting Engineers. required under Article 4,Section 4.4, but such <br /> reliance is only allowed if the structural analysis states <br /> specifically what data from the specifications the <br /> structural analysis relies upon. <br /> Water Filtration Plant Site Plan 2017 Design-Builder may rely on drawing to ascertain <br /> general arrangement of facilities and approximate <br /> dimensions.All dimensions and utility locations must <br /> be field verified where required for construction <br /> activities. <br /> Record Drawings: 2018 Design-Builder may rely on drawings to ascertain <br /> Ultraflote Roof Record Drawings general arrangement of facilities and approximate <br /> dimensions.All dimensions of the East Clearwell must <br /> be field verified for final confirmation of dimensions <br /> prior to roof fabrication. <br /> Geotechnical: March 13, In support of the structural analysis under Article 4, <br /> Geotechnical Report for Preliminary 2006 Section 4.4,the Design-Builder may rely on the <br /> Design City of Everett Proposed following: boring and test pit log data in Appendix A; <br /> Clearwell No.2 geotechnical laboratory testing procedures and results <br /> in Appendix B, but not interpretation;and <br /> supplemental Cone Penetration Test data, but not <br /> interpretation. Design-Builder shall not apply seismic <br /> design criteria found in this report to the East <br /> Clearwell Roof Replacement Project, but may <br /> reference it for a general understanding of the original <br /> design. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.