My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Regularly instruct workers of the importance of maintaining sanitary conditions and confirm <br /> compliance. <br /> 5. Prohibit workers from having domestic animals on-site or in vehicles. <br /> 6. Prohibit fuel,food, cigarettes, liquids other than water,and similar items from interior of the East <br /> Clearwell. <br /> 5.7 Notification Requirements <br /> Requirements for obtaining Demolition Notices to Proceed are set forth in Article 5 of the Design- <br /> Build Contract. In addition, Design-Builder shall: <br /> 1. Notify the Owner's Representative a minimum of two working days prior to prior to <br /> commencement of work to take any utility, system,or process out of service. <br /> 5.8 Health and Safety <br /> In addition to the requirements of Article 2,Section 2.8 of the General Conditions, Design-Builder <br /> shall comply with the following requirements: <br /> 1. Adapt Design-Builder's Health and Safety Plan to the specific nature of the work for the Project; <br /> 2. Identify and comply with all applicable federal,state, and local laws related to health and safety, <br /> including confined space entry. <br /> 3. Provide regular working training prior to and throughout construction on all aspects of Design- <br /> Builder's Health and Safety Plan <br /> 4. Maintain documented confined space entry procedures and certifications on-site as required by <br /> OSHA. <br /> 5.9 Housekeeping <br /> In addition to complying with Article 2, Section 2.7.6 of the General Conditions Design-Builder shall: <br /> 1. Conduct Site walk-throughs at the end of each work day and work week and collect all litter and <br /> trash from Sites. <br /> 2. Maintain staging and stockpiling area(s) in an organized fashion and keep them clear of litter <br /> and debris. <br /> 5.10 Construction Control and Environmental Protection <br /> 5.10.1 Erosion Control <br /> Design-Builder shall develop and erosion control plan and provide erosion and sediment control <br /> measures to achieve the following: <br /> 1. Comply with all applicable surface water regulations <br /> 2. Prevent disturbance, erosion and scour <br /> 3. Mitigate erosion potential using WDOE Best Management Practices <br /> 4. Treat sediment laden water for acceptable discharge <br /> 5. Prevent the conveyance of sediment into surface waters, drainage systems, roads, and <br /> environmentally critical areas. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.