My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.10.2 Spill Prevention and Control <br /> Design-Builder shall develop a spill prevention plan and shall: <br /> 1. Handle all petroleum and chemical products in accordance with applicable regulations <br /> 2. Avoid throwing,spreading, or otherwise discharging petroleum and chemical products on or <br /> beneath the surface of the ground. <br /> 3. Provide spill kits at all construction areas and other suitable measures for the prevention and <br /> control of spills. <br /> 4. Train workers on spill prevention and spill control measures, including use of spill kits. <br /> 5.10.3 Compliance with Environmental Regulations <br /> Design-Builder shall comply with all environmental regulations and permit conditions including but <br /> not limited to: <br /> 1. All local,state, and federal regulations, including Washington Model Toxics Control Act <br /> concerning emissions or disposal of solid, particulate, liquid,or gaseous matter as a result of the <br /> cleaning, painting, or other activities. <br /> 2. All Puget Sound Clean Air Agency(PSCAA) regulations in controlling dust during construction. <br /> Spraying with dust control chemicals and street flushing is prohibited. No burning of trash on the <br /> site is permitted. <br /> 3. All applicable City of Everett,Snohomish County, and state noise regulations. <br /> Any fines imposed by any regulatory agency as a result of the Design-Builder's noncompliance shall <br /> be paid by the Design-Builder. <br /> 5.11 Construction Documentation <br /> 5.11.1 Pre-construction Documentation of Existing Conditions <br /> Design-Builder shall document existing conditions prior to construction at the Project Site. Design- <br /> Builder shall conduct a survey of the East Clearwell interior and exterior elevations, and provide a <br /> record of the survey to the Owner. <br /> Design-Builder and the Owner's Representative shall jointly survey the Site, existing structures and <br /> facilities, paving, and other items, noting and photographing all existing conditions at the East <br /> Clearwell and Screen House Bridge.All existing cracks,sags or other damage shall be measured for <br /> length, width, height and location, and recorded.All existing cracks shall be marked with paint. All <br /> photographs shall be taken by a photographer with relevant experience in documenting industrial <br /> and municipal facilities.All photographs shall be taken on minimum 8 megapixel minimum digital <br /> format to produce sharp and clear images. <br /> Design-Builder shall also prepare a pre-construction video of all areas and existing facilities that <br /> could be affected by construction.Video shall be prepared by the Design-Builder in high definition <br /> digital format(minimum 72Op) with adequate resolution to produce sharp and clear images with <br /> accurate colors and free of distortion.Audio commentary shall be provided describing the areas and <br /> items viewed and direction with additional commentary as requested by the City. <br /> All pre-construction documentation shall be acceptable to the City prior to commencing work. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.