My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3 East Clearwell Roof System Demolition Requirements <br /> See Article 5 of the Contract for specific requirements related to obtaining Demolition Notices to <br /> Proceed. <br /> At the East Clearwell, Design-Builder shall: <br /> 1. Provide a detailed demolition plan for the roof showing methods to be used throughout the <br /> demolition,and specifically addressing measures to protect adjacent and nearby structures and <br /> identification of disposal locations. Demolition plan shall also include a schedule, identify <br /> location(s)for demolition debris disposal, and safety measures to be employed during <br /> demolition. <br /> 2. Demolish the existing roof and support structures as needed to allow construction of new roof <br /> system.All components associated with the existing roof system that are not required for the <br /> new roof system shall be demolished, except for support columns if possible,which the City <br /> desires to retain to avoid potential floor damage caused by removal. <br /> 3. Protect newly installed existing washdown system during demolition. <br /> 4. Protect the operating West Clearwell vents from dust and other demolition related contaminants. <br /> This may include measures such as temporarily blocking a portion of selected vents or installing <br /> temporary filter material over the vents to prevent contaminants from entering the on-line <br /> clearwell. Submit the proposed plan to the Owner's Representative for approval. <br /> 5. Unless otherwise specified, replace all features impacted by the work with new ones of equal or <br /> greater quality and service life expectations including but not limited to,support brackets, <br /> conduit, piping,and connections. <br /> 6. Transport and dispose of demolition debris, including excess soil,at appropriately permitted <br /> facility(ies). Provide the City with copies of all disposal records. <br /> ARTICLE 7. SITE RESTORATION AND CLEANUP <br /> Design-Builder shall: <br /> 1. Provide final cleaning of the Site. Clean,sweep, and wash all work provided under the Contract <br /> and existing facilities impacted by the work and remove all temporary structures and debris. <br /> 2. Fully restore disturbed areas including areas disturbed by demolition work so the areas are <br /> uniformly graded, level, and smoothly transition to match the ground elevations of adjacent <br /> areas. If needed import soil to achieve required grades. Provide proper compaction to avoid <br /> settlement over time. <br /> 3. Replace any disturbed landscaping in kind, and hydroseed areas disturbed during demolition <br /> with a seed mix appropriate for the area. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.