My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA Geosciences Inc 5/20/2020 Amendment 3
>
Contracts
>
6 Years Then Destroy
>
2020
>
HWA Geosciences Inc 5/20/2020 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:43:17 PM
Creation date
6/1/2020 12:43:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA Geosciences Inc
Approval Date
5/20/2020
Council Approval Date
5/31/2020
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Geotechnical Design Beverly Lake
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$15,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Grant Award Federal Emergency Management Agency (2)
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> February 7, 2020 <br /> HWA Project No. 2016-044-21 <br /> Geotechnical Construction Assistance <br /> HWA proposes to provide the following services to support the completion of the construction <br /> phase of the project. <br /> • Review Geotechnical Submittals and RFIs:HWA will provide review and comments <br /> on geotechnical related submittals and RFI's during construction. <br /> • Geotechnical Site Visits: HWA will make up to three (3) site visits to observe <br /> geotechnical challenges and provide geotechnical guidance. These site visits will be <br /> completed as needed and at the direction of the City. <br /> • Miscellaneous Geotechnical Construction Services. HWA will provide up to 20 <br /> hours of miscellaneous geotechnical support during construction. <br /> ASSUMPTIONS: <br /> • HWA will not provide geotechnical materials testing, compaction testing, or coffer dam <br /> installation inspection during construction. <br /> • HWA site visits will be limited to 3 during construction <br /> • HWA will not attend any design meeting or construction meetings <br /> DELIVERABLES: <br /> • Revised Final Geotechnical report <br /> • Field reports for site visits <br /> • RFI and submittal review comments <br /> O.O <br /> We appreciate the opportunity to provide geotechnical engineering services on this project. Please <br /> feel free to call if you have any questions or need additional information. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> JY&rJJ 4 Flu'11 <br /> Donald J. Huling, P.E. <br /> Geotechnical Engineer, Principal <br /> HWA Scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.