My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 <br /> 2 "Additional Planing Bituminous Pavement", shall be measured by the square yard <br /> 3 <br /> 4 "HMA Class %", PG 64-22", shall be measured by the ton. <br /> ' 5 <br /> 6 5-04.5 Payment <br /> I 7 Payment will be made in accordance with Section 1-04.1, for each of the following bid items <br /> 8 that are included in the proposal: <br /> 9 <br /> I <br /> 10 "HMA Class '/2" PG 64-22", per ton. <br /> 11 <br /> 12 The unit contract price per ton for"HMA Class 1/2" PG 64-22", shall be full compensation for <br /> 13 all costs incurred to carry out the requirements of Section 5-04 except for those costs <br /> I14 included in other items which are included in the sub-section and which are included in the <br /> 15 proposal. <br /> 16 <br /> 111 17 HMA for Pre-leveling, if required by the Engineer, will be paid for under bid item, "HMA Class <br /> 18 '/2" PG 64-22", per ton. <br /> 19 <br /> I <br /> 20 21 All costs for"Asphalt Tack Coat", "Anti Stripping Additive", and"Compaction Adjustment"shall <br /> be included in the unit contract price per ton for"HMA Class 1/" PG 64-22", per ton. <br /> 22 <br /> I 23 "HMA Class 3/8" PG 64-22", per ton. <br /> 24 <br /> 25 The unit contract price per ton for"HMA Class 3/8" PG 64-22", shall be full compensation for <br /> I 26 all costs incurred to carry out the requirements of Section 5-04 except for those costs <br /> 27 included in other items which are included in the sub-section and which are included in the <br /> 28 proposal. <br /> 29 <br /> I30 All costs for"Asphalt Tack Coat", "Anti Stripping Additive", and"Compaction Adjustment"shall <br /> 31 be included in the unit contract price per ton for"HMA Class 3/8" PG 64-22", per ton. <br /> 32 <br /> I 33 <br /> 34 "Planing Bituminous Pavement (2" Deep)", per square yard. <br /> 35 <br /> I 36 The Unit contract price for "Planing Bituminus Pavement (2" Deep)", per square yard shall <br /> 37 be full payment for all costs incurred to perform the work described in Section 5-04.3(14). <br /> 38 <br /> I <br /> 39 <br /> 40 "Additional Planing Bituminous Pavement", per square yard. <br /> 41 <br /> I 42 The Unit contract price for "Additional Planing Bituminus Pavement", per square yard shall <br /> 43 be full payment for all costs incurred to perform the work described in Section 5-04.3(14). <br /> 44 <br /> I 45 <br /> 46 :END DIVISION5.RTF <br /> 47 <br /> 48 <br /> I49 END DIVISION 5 <br /> I <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 65 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.