My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 2 I <br /> 3 DIVISION7.GR7 <br /> 4 Division 7 <br /> 5 Drainage Structures, Storm Sewers, Sanitary 1 <br /> 6 Sewers, Water Mains, and Conduits <br /> 7 <br /> 8 7-05.DOCX <br /> 9 Manholes, Inlets, Catch Basins, and Drywells <br /> 10 <br /> 11 7-05.3.DOCX <br /> 12 Construction Requirements <br /> 13 <br /> 14 GLF 7-05.3(1).DOCX I <br /> 15 Adjusting Manholes and Catch Basins to Grade <br /> 16 <br /> 17 Section 7-05.3(1) of the standard specifications is deleted and replaced with the following: I <br /> 18 <br /> 19 (******) <br /> 20 In most work locations, planing depth is equal to overlay depth. Therefore, significant <br /> 21 iron adjustment is not anticipated, and adjustment of structures to grade shall occur only <br /> 22 as needed and/or directed by the engineer. <br /> 23 <br /> 24 Manholes, catch basins, and other structures shall not be adjusted to grade until the <br /> 25 pavement is completed, at which time the center of each structure shall be carefully I <br /> 26 relocated from references previously established by the Contractor. The structure shall <br /> 27 then be brought to proper grade as follows: <br /> 28 1 29 1. The existing cast iron ring and cover on manholes and existing cast iron frame <br /> 30 and grates for catch basins and inlets shall be removed and thoroughly cleaned <br /> 31 before reinstalling at the new elevation. I <br /> 32 <br /> 33 2. The asphalt concrete pavement shall be cut and removed to a new circle, the <br /> 34 diameter of which shall be equal to the outside diameter of the cast iron frame <br /> 35 plus 2'. 1 <br /> 36 <br /> 37 3. The roadway surface materials and crushed rocks shall be removed so the <br /> 38 structure casting can be adjusted to the finished road grade elevation. I <br /> 39 <br /> 40 4. The cast iron frame shall be placed on concrete blocks and wedged up to the <br /> 41 desired grade with plastic wedges. I <br /> 42 <br /> 43 5. The edges of the asphalt concrete pavement and the outer edge of the castings <br /> 44 shall be painted with tack and HMA Class %" PG 64-22 shall be placed and 1 <br /> 45 compacted in layers to a minimum of 91% of the maximum theoretical density of <br /> 46 the HMA. <br /> 47 <br /> 48 The completed patch shall match the existing paved surface for texture, density, and <br /> 49 uniformity of grade. The joint between the patch and the existing pavement shall then <br /> 50 be carefully painted with hot asphalt cement or asphalt emulsion and shall be <br /> 51 immediately covered with dry paving sand before the asphalt cement solidifies. <br /> 52 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 66 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.