Laserfiche WebLink
I <br /> 1 The inside throat of the structure shall be thoroughly mortared and plastered through to <br /> 2 the outside of the structure's concrete adjustment rings. <br /> 3 <br /> 4 Castings that need replacement shall be identified by the City of Everett. Replacement <br /> I 5 casting will be supplied by the City of Everett and original casting will be picked up by <br /> 6 the City of Everett. <br /> 7 <br /> I <br /> 8 GLF 7-05.3(5).DOCX <br /> 9 Adjusting Valve Boxes to Grade <br /> 10 (******) <br /> 11 <br /> 12 Section 7-05.3 of the standard specifications is supplemented with the following: <br /> I <br /> 13 <br /> 14 (******) <br /> 15 Where shown in the plans, existing valve boxes and covers shall be adjusted to the <br /> 16 grade as staked or otherwise designated by the Engineer. The adjustment of the valve <br /> 17 box to grade by the use of riser rings is not allowed. <br /> I <br /> 18 <br /> 19 Removal operations shall be conducted to prevent damage to the valve boxes. Any <br /> 20 parts or materials damaged due to the Contractor's operations shall be replaced at the <br /> I <br /> 21 Contractor's expense. <br /> 22 <br /> 23 The Contractor shall conduct the valve box adjustments so that the fully-adjusted box <br /> 24 allows the respective valve to be fully operational. The Contractor shall remove all debris <br /> I <br /> 25 from the adjusted valve boxes to ensure such operational condition. <br /> 26 <br /> 27 Castings that need replacement shall be identified by the City of Everett. Replacement <br /> I 28 casting will be supplied by the City of Everett and original casting will be picked up by <br /> 29 the City of Everett. <br /> 30 <br /> I <br /> 31 GLF 7-05.4.DOCX <br /> 32 7-05.4 Measurement <br /> 33 <br /> I 34 Section 7-05.4 of the standard specifications is deleted and replaced with the following: <br /> 35 <br /> I <br /> 36 (******) <br /> 37 "Adjust Manhole to Grade", shall be measured per each. <br /> 38 <br /> I 39 "Adjust Catch Basin/Inlet to Grade", shall be measured per each. <br /> 40 <br /> 41 "Adjust Valve Box to Grade", shall be measured per each. <br /> I <br /> 42 <br /> 43 GLF 7-05.5.DOCX <br /> 44 7-05.5 Payment <br /> I <br /> 45 <br /> 46 Section 7-05.5 of the standard specifications is deleted and replaced with the following: <br /> 47 <br /> I <br /> ' 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 67 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />