Laserfiche WebLink
I <br /> 1 (******) I <br /> 2 Payment will be made for each of the following bid items that are included in the proposal: <br /> 3 <br /> 4 "Adjust Manhole to Grade", per each. <br /> 5 <br /> 6 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 7 <br /> 8 "Adjust Valve Box to Grade", per each. <br /> 9 <br /> 10 The payment for"Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall be full <br /> 11 compensation for all costs necessary to make the adjustment including temporary cover to <br /> 12 adjust the existing structure to required elevation, construction of the asphalt transition <br /> 13 around the structure, and restoration of the adjacent area. Adjustment of any structures twice <br /> 14 will be paid as one adjustment. <br /> 15 <br /> 16 END DIVISION7.RTF <br /> 17 <br /> 18 END DIVISION 7 <br /> 19 , <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> 1 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 68 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />