Laserfiche WebLink
I <br /> 1 Completion Date <br /> 2 The day all the Work specified in the Contract is completed and all the obligations of the <br /> 3 Contractor under the contract are fulfilled by the Contractor. All documentation required <br /> 4 by the Contract and required by law must be furnished by the Contractor before <br /> I <br /> 5 establishment of this date. <br /> 6 Final Acceptance Date <br /> 7 The date on which the Contracting Agency accepts the Work as complete. <br /> I 8 <br /> 9 Supplement this Section with the following: <br /> 10 <br /> 11 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 12 Provisions, to the terms "Department of Transportation", "Washington State Transportation <br /> 13 Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", and <br /> I 14 "State Treasurer" shall be revised to read "Contracting Agency". <br /> 15 <br /> 16 All references to the terms "State" or"state" shall be revised to read "Contracting Agency" <br /> I <br /> 17 18 unless the reference is to an administrative agency of the State of Washington, a State <br /> statute or regulation, or the context reasonably indicates otherwise. <br /> 19 <br /> 20 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> I21 designated location". <br /> 22 <br /> 23 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 24 Contracting Agency form(s) by which final payment is authorized, and final completion and <br /> 25 acceptance granted. <br /> 26 <br /> I <br /> 27 Additive <br /> 28 A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, <br /> 29 which may, at the discretion of the Contracting Agency, be awarded in addition to the base <br /> I <br /> 30 31 bid. <br /> 32 Alternate <br /> I <br /> 33 34 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> Proposal, from which the Contracting Agency may make a choice between different <br /> 35 methods or material of construction for performing the same work. <br /> 36 <br /> I37 Business Day <br /> 38 A business day is any day from Monday through Friday except holidays as listed in Section <br /> 39 1-08.5. <br /> I 40 <br /> 41 Contract Bond <br /> 42 The definition in the Standard Specifications for"Contract Bond" applies to whatever bond <br /> I <br /> 43 44 form(s) are required by the Contract Documents, which may be a combination of a Payment <br /> Bond and a Performance Bond. <br /> 45 <br /> 46 Contract Documents <br /> 47 See definition for"Contract". <br /> 48 <br /> I 49 Contract Time <br /> 50 The period of time established by the terms and conditions of the Contract within which the <br /> 51 Work must be physically completed. <br /> I52 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 3 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />