Laserfiche WebLink
I <br /> 1 Notice of Award <br /> 2 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 3 Contracting Agency's acceptance of the Bid Proposal. <br /> 4 <br /> 5 Notice to Proceed <br /> 6 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 7 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 8 the Contract time begins. <br /> 9 <br /> 10 Traffic <br /> 11 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 12 equestrian traffic. <br /> 13 <br /> 14 1-02.1.RTF <br /> 15 1-02 BID PROCEDURES AND CONDITIONS <br /> 16 <br /> 17 1-02.1 Prequalification of Bidders <br /> 18 <br /> 19 Delete this section and replace it with the following: <br /> 20 <br /> 21 1-02.1 Qualifications of Bidder 1 <br /> 22 (January 24, 2011 APWA GSP) <br /> 23 <br /> 24 Before award of a public works contract, a bidder must meet at least the minimum <br /> 25 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to be <br /> 26 awarded a public works project. <br /> 27 <br /> 28 FCOE 1-02.2.DOCX <br /> 29 1-02.2 Plans and Specifications <br /> 30 (June 27, 2011 APWA GSP) <br /> 31 <br /> 32 Delete this section and replace it with the following: <br /> 33 <br /> 34 Information as to where Bid Documents can be obtained or reviewed can be found in the Call <br /> 35 for Bids (Advertisement for Bids) for the work. <br /> 36 <br /> 37 After award of the contract, plans and specifications will be issued to the Contractor at no <br /> 38 cost as detailed below: <br /> 39 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 8 Furnished automatically <br /> upon award. <br /> Contract Provisions Furnished automatically <br /> 4 upon award. <br /> Large plans (e.g., 22" x Furnished only upon <br /> 34") 2 request. <br /> 40 <br /> 41 Additional plans and Contract Provisions may be obtained by the Contractor from the source <br /> 42 stated in the Call for Bids, at the Contractor's own expense. <br /> 43 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 4 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />