My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 COE 1-02.5.RTF <br /> 2 1-02.5 Proposal Forms <br /> 3 (July 31, 2017 APWA GSP & COE) <br /> 4 <br /> I 5 Delete this section and replace it with the following: <br /> 6 <br /> 7 The Proposal Form will identify the project and its location and describe the work. It will also <br /> I <br /> 8 9 list estimated quantities, units of measurement, the items of work, and the materials to be <br /> furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that <br /> 10 call for, but are not limited to, unit prices; extensions; summations; the total bid amount; <br /> 11 signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda; <br /> 12 the bidder's name, address, telephone number, and signature; the bidder's <br /> 13 UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor's <br /> I 14 Registration Number; and a Business License Number, if applicable. Bids shall be <br /> 15 completed by typing or shall be printed in ink by hand, preferably in black ink. The required <br /> 16 certifications are included as part of the Proposal Form. <br /> 17 <br /> I <br /> 18 The Contracting Agency reserves the right to arrange the proposal forms with alternates and <br /> 19 additives, if such be to the advantage of the Contracting Agency. The bidder shall bid on all <br /> 20 alternates and additives set forth in the Proposal Form unless otherwise specified. <br /> I 21 <br /> 22 The low bidder shall be awarded based on the sum of all schedules including bid additive <br /> 23 schedules <br /> I 24 <br /> 25 1-02.6.RTF <br /> 26 1-02.6 Preparation of Proposal <br /> I 27 (July 11, 2018 APWA GSP) <br /> 28 <br /> 29 Supplement the second paragraph with the following: <br /> I 30 4. If a minimum bid amount has been established for any item, the unit or lump sum price <br /> 31 must equal or exceed the minimum amount stated. <br /> 32 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed <br /> I33 by the signer of the bid. <br /> 34 <br /> 35 Delete the last two paragraphs, and replace them with the following: <br /> I 36 <br /> 37 If no Subcontractor is listed, the Bidder acknowledges that it does not intend to use any <br /> 38 Subcontractor to perform those items of work. <br /> I 39 <br /> 40 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law <br /> 41 Compliance form, provided by the Contracting Agency. Failure to return this certification as <br /> 42 part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for Award. <br /> 43 A Contractor Certification of Wage Law Compliance form is included in the Proposal Forms. <br /> 44 <br /> I <br /> 45 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. <br /> 46 <br /> 47 A bid by a corporation shall be executed in the corporate name, by the president or a vice <br /> 48 president (or other corporate officer accompanied by evidence of authority to sign). <br /> I 49 <br /> 50 A bid by a partnership shall be executed in the partnership name, and signed by a partner. A <br /> 51 copy of the partnership agreement shall be submitted with the Bid Form if any UDBE <br /> I <br /> 52 requirements are to be satisfied through such an agreement. <br /> 53 <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 5 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.