My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 A bid by a joint venture shall be executed in the joint venture name and signed by a member <br /> 2 of the joint venture. A copy of the joint venture agreement shall be submitted with the Bid I <br /> 3 Form if any UDBE requirements are to be satisfied through such an agreement. <br /> 4 <br /> 5 1-02.6(1).RTF I <br /> 6 Add the following new section: <br /> 7 <br /> 8 1-02.6(1) Recycled Materials Proposal I <br /> 9 (January 4, 2016 APWA GSP) <br /> 10 <br /> 11 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into the <br /> 12 project, using the form provided in the Contract Provisions. <br /> 13 <br /> 14 1-02.7.RTF <br /> 15 1-02.7 Bid Deposit <br /> 16 (March 8, 2013 APWA GSP) <br /> 17 <br /> 18 Supplement this section with the following: <br /> 19 <br /> 20 Bid bonds shall contain the following: <br /> 21 1. Contracting Agency-assigned number for the project; I <br /> 22 2. Name of the project; <br /> 23 3. The Contracting Agency named as obligee; I <br /> 24 4. The amount of the bid bond stated either as a dollar figure or as a percentage which <br /> 25 represents five percent of the maximum bid amount that could be awarded; <br /> 26 5. Signature of the bidder's officer empowered to sign official statements. The signature of I <br /> 27 the person authorized to submit the bid should agree with the signature on the bond, and <br /> 28 the title of the person must accompany the said signature; <br /> 29 6. The signature of the surety's officer empowered to sign the bond and the power of I <br /> 30 attorney. <br /> 31 <br /> 32 If so stated in the Contract Provisions, bidder must use the bond form included in the <br /> 33 Contract Provisions. <br /> 34 <br /> 35 If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. I <br /> 36 <br /> 37 1-02.9.OptionA.RTF <br /> 38 1-02.9 Delivery of Proposal <br /> 39 (December 19, 2019 APWA GSP, Option A) <br /> 40 <br /> 41 Delete this section and replace it with the following: <br /> 42 <br /> 43 Each Proposal shall be submitted in a sealed envelope, with the Project Name and Project <br /> 44 Number as stated in the Call for Bids clearly marked on the outside of the envelope, or as I <br /> 45 otherwise required in the Bid Documents, to ensure proper handling and delivery. <br /> 46 <br /> 47 To be considered responsive on a FHWA-funded project, the Bidder may be required to <br /> 48 submit the following items, as required by Section 1-02.6: <br /> 49 <br /> 50 • UDBE Written Confirmation Document from each UDBE firm listed on the Bidder's <br /> 51 completed UDBE Utilization Certification (WSDOT 272-056U) I <br /> 52 • Good Faith Effort (GFE) Documentation <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 6 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.