My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 which a 4-10 shift is worked would ordinarily be charged as a working day then the fifth day <br /> 2 of that week will be charged as a working day whether or not the Contractor works on that <br /> 3 day. <br /> 4 <br /> 5 Revise the sixth paragraph to read: <br /> 6 <br /> 7 The Engineer will give the Contractor written notice of the completion date of the contract <br /> 8 after all the Contractor's obligations under the contract have been performed by the <br /> 9 Contractor. The following events must occur before the Completion Date can be <br /> 10 established: <br /> 11 1. The physical work on the project must be complete; and ' <br /> 12 2. The Contractor must furnish all documentation required by the contract and required by <br /> 13 law, to allow the Contracting Agency to process final acceptance of the contract. The <br /> 14 following documents must be received by the Project Engineer prior to establishing a <br /> 15 completion date: <br /> 16 a. Certified Payrolls (per Section 1-07.9(5)). <br /> 17 b. Material Acceptance Certification Documents <br /> 18 c. Monthly Reports of Amounts Credited as DBE Participation, as required by the <br /> 19 Contract Provisions. <br /> 20 d. Final Contract Voucher Certification <br /> 21 e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor and all <br /> 22 Subcontractors <br /> 23 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 24 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 25 Notice of Termination by Ecology; and no rejection of the Notice of Termination by <br /> 26 Ecology. This requirement will not apply if the Construction Stormwater General <br /> 27 Permit is transferred back to the Contracting Agency in accordance with Section 8- <br /> 28 01.3(16). <br /> 29 g. Property owner releases per Section 1-07.24 <br /> 30 <br /> 31 1-08.5.INST2.GR1 <br /> 32 Section 1-08.5 is supplemented with the following: <br /> 33 <br /> 34 <br /> 35 (March 13, 1995) <br /> 36 <br /> 37 This project shall be physically completed within ***fifty-eight (58) *** working days. <br /> 38 1 39 1-08.9.RTF <br /> 40 1-08.9 Liquidated Damages <br /> 41 (August 14, 2013 APWA GSP) <br /> 42 <br /> 43 Revise the fourth paragraph to read: <br /> 44 <br /> 45 When the Contract Work has progressed to Substantial Completion as defined in the <br /> 46 Contract, the Engineer may determine that the work is Substantially Complete. The <br /> 47 Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> 48 overruns in Contract time occurring after the date so established, the formula for liquidated <br /> 49 damages shown above will not apply. For overruns in Contract time occurring after the <br /> 50 Substantial Completion Date, liquidated damages shall be assessed on the basis of direct <br /> 51 engineering and related costs assignable to the project until the actual Physical Completion <br /> 52 Date of all the Contract Work. The Contractor shall complete the remaining Work as <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 32 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.