My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 promptly as possible. Upon request by the Project Engineer, the Contractor shall furnish a <br /> 2 written schedule for completing the physical Work on the Contract. <br /> 3 <br /> 4 1-09.GR1 <br /> I 5 Measurement and Payment <br /> 6 <br /> 7 1-09.6.RTF <br /> I 8 1-09.6 Force Account <br /> 9 (October 10, 2008 APWA GSP) <br /> 10 <br /> I 11 Supplement this section with the following: <br /> 12 <br /> 13 The Contracting Agency has estimated and included in the Proposal, dollar amounts for all <br /> 14 items to be paid per force account, only to provide a common proposal for Bidders. All such <br /> I15 dollar amounts are to become a part of Contractor's total bid. However, the Contracting <br /> 16 Agency does not warrant expressly or by implication, that the actual amount of work will <br /> 17 correspond with those estimates. Payment will be made on the basis of the amount of work <br /> 18 actually authorized by Engineer. <br /> 19 <br /> 20 1-09.8.GR1 <br /> I 21 Payment For Material On Hand <br /> 22 <br /> 23 1-09.8.INST1.GR1 <br /> I 24 The last paragraph of Section 1-09.8 is revised to read: <br /> 25 <br /> 26 1-09.8.OPT1.GR1 <br /> I <br /> 27 28 (August 3, 2009) <br /> The Contracting Agency will not pay for material on hand when the invoice cost is less than <br /> 29 $2,000. As materials are used in the work, credits equaling the partial payments for them will <br /> I 30 be taken on future estimates. Each month, no later than the estimate due date, the <br /> 31 Contractor shall submit a letter to the Engineer that clearly states: 1) the amount originally <br /> 32 paid on the invoice (or other record of production cost) for the items on hand, 2) the dollar <br /> amount of the material incorporated into each of the various work items for the month, and <br /> 133 <br /> 34 3) the amount that should be retained in material on hand items. If work is performed on the <br /> 35 items and the Contractor does not submit a letter, all of the previous material on hand <br /> 36 payment will be deducted on the estimate. Partial payment for materials on hand shall not <br /> I 37 constitute acceptance. Any material will be rejected if found to be faulty even if partial <br /> 38 payment for it has been made. <br /> 39 <br /> I 40 1-09.9(Payments).RTF <br /> 41 1-09.9 Payments <br /> 42 (March 13, 2012 APWA GSP) <br /> I <br /> 43 <br /> 44 Delete the first four paragraphs and replace them with the following: <br /> 45 <br /> 46 The basis of payment will be the actual quantities of Work performed according to the <br /> 47 Contract and as specified for payment. <br /> 48 <br /> I <br /> 49 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 50 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 51 performed on a monthly basis. A breakdown is not required for lump sum items that include <br /> 52 a basis for incremental payments as part of the respective Specification. Absent a lump <br /> I 2020 PAVEMENT MAINTENANCE OVERLAY WORK ORDER 3727 PAGE 33 OF 79 SPECIAL PROVISIONS <br /> FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.