1 <br /> 1 sum breakdown, the Project Engineer will make a determination based on information <br /> 2 available. The Project Engineer's determination of the cost of work shall be final. <br /> 3 <br /> 4 Progress payments for completed work and material on hand will be based upon progress I <br /> 5 estimates prepared by the Engineer. A progress estimate cutoff date will be established at <br /> 6 the preconstruction conference. <br /> 7 1 8 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 9 commences the work, and successive progress estimates will be made every month <br /> 10 thereafter until the Completion Date. Progress estimates made during progress of the work 1 <br /> 11 are tentative, and made only for the purpose of determining progress payments. The <br /> 12 progress estimates are subject to change at any time prior to the calculation of the final <br /> 13 payment. <br /> 14 1 <br /> 15 The value of the progress estimate will be the sum of the following: <br /> 16 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> 17 work completed multiplied by the unit price. <br /> 18 2. Lump Sum Items in the Bid Form —based on the approved Contractor's lump sum <br /> 19 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 20 determination. <br /> 21 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or <br /> 22 other storage area approved by the Engineer. <br /> 23 4. Change Orders—entitlement for approved extra cost or completed extra work as <br /> 24 determined by the Engineer. <br /> 25 1 26 Progress payments will be made in accordance with the progress estimate less: <br /> 27 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 28 2. The amount of progress payments previously made; and I <br /> 29 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 30 Contract Documents. <br /> 31 1 <br /> 32 Progress payments for work performed shall not be evidence of acceptable performance or <br /> 33 an admission by the Contracting Agency that any work has been satisfactorily completed. <br /> 34 The determination of payments under the contract will be final in accordance with Section <br /> 35 1-05.1. <br /> 36 <br /> 37 1-09.9(1).GR1 <br /> 38 Retainage <br /> 39 <br /> 40 1-09.9(1),INSTI.GR1 I <br /> 41 Section 1-09.9(1) content and title is deleted and replaced with the following: <br /> 42 <br /> 43 1-09.9(1).OPT1.GR1 I <br /> 44 (June 27, 2011) <br /> 45 Vacant <br /> 46 I 47 1-10.GRI <br /> 48 Temporary Traffic Control <br /> 49 <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 34 OF 79 SPECIAL PROVISIONS 1 <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />