Laserfiche WebLink
I <br /> 1 b. Asphalt Binder Content—The Engineer may order or approve changes to <br /> 2 asphalt binder content. The maximum adjustment from the approved mix design <br /> 3 for the asphalt binder content shall be 0.3 percent <br /> 4 <br /> 5 5-04.3(9)A Vacant I <br /> 6 <br /> 7 5-04.3(9)B Vacant <br /> 8 <br /> 9 <br /> 10 5-04.3(9)C Mixture Acceptance— Nonstatistical Evaluation 1 <br /> 11 HMA mixture which is accepted by Nonstatistical Evaluation will be evaluated by the <br /> 12 Contracting Agency by dividing the HMA tonnage into lots. I <br /> 13 <br /> 14 5-04.3(9)C1 Mixture Nonstatistical Evaluation— Lots and Sublots <br /> 15 A lot is represented by randomly selected samples of the same mix design that will be <br /> 16 tested for acceptance. A lot is defined as the total quantity of material or work produced for <br /> 17 each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be equal to <br /> 18 one day's production or 800 tons, whichever is less except that the final sublot will be a I <br /> 19 minimum of 400 tons and may be increased to 1200 tons. <br /> 20 <br /> 21 All of the test results obtained from the acceptance samples from a given lot shall be I <br /> 22 evaluated collectively. If the Contractor requests a change to the JMF that is approved, the <br /> 23 material produced after the change will be evaluated on the basis of the new JMF for the <br /> 24 remaining sublots in the current lot and for acceptance of subsequent lots. For a lot in <br /> 25 progress with a CPF less than 0.75, a new lot will begin at the Contractor's request after the <br /> 26 Engineer is satisfied that material conforming to the Specifications can be produced. <br /> 27 <br /> 28 Sampling and testing for evaluation shall be performed on the frequency of one sample per <br /> 29 sublot. <br /> 30 I <br /> 31 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling <br /> 32 Samples for acceptance testing shall be obtained by the Contractor when ordered by the I <br /> 33 Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer <br /> 34 and in accordance with AASHTO T 168. A minimum of three samples should be taken for <br /> 35 each class of HMA placed on a project. If used in a structural application, at least one of the <br /> 36 three samples shall to be tested. 111 <br /> 37 <br /> 38 Sampling and testing HMA in a Structural application where quantities are less than 400 <br /> 39 tons is at the discretion of the Engineer. <br /> 40 <br /> 41 For HMA used in a structural application and with a total project quantity less than 800 tons <br /> 42 but more than 400 tons, a minimum of one acceptance test shall be performed. In all cases, <br /> 43 a minimum of 3 samples will be obtained at the point of acceptance, a minimum of one of <br /> 44 the three samples will be tested for conformance to the JMF: <br /> 45 <br /> 46 • If the test results are found to be within specification requirements, additional testing <br /> 47 will be at the Engineer's discretion. I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 54 OF 79 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />