Laserfiche WebLink
I <br /> 1 testing shall be borne by the Contractor. If the CPF is greater than or equal to 0.75, the cost <br /> 2 of sampling and testing will be borne by the Contracting Agency. If the material is rejected I <br /> 3 before placement and the CPF is greater than or equal to 0.75, compensation for the <br /> 4 rejected material will be at a CPF of 0.75. If rejection occurs after placement and the CPF is <br /> 5 greater than or equal to 0.75, compensation for the rejected material will be at the calculated I <br /> 6 CPF with an addition of 25 percent of the unit Contract price added for the cost of removal <br /> 7 and disposal. <br /> 8I <br /> 9 5-O4.3(11)D Rejection -A Partial Sublot <br /> 10 In addition to the random acceptance sampling and testing, the Engineer may also isolate I <br /> 11 from a normal sublot any material that is suspected of being defective in relative density, <br /> 12 gradation or asphalt binder content. Such isolated material will not include an original <br /> 13 sample location. A minimum of three random samples of the suspect material will be <br /> 14 obtained and tested. The material will then be statistically evaluated as an independent lot in I <br /> 15 accordance with Section 1-06.2(2). <br /> 16 <br /> 17 5-O4.3(11)E Rejection -An Entire Sublot 1 <br /> 18 An entire sublot that is suspected of being defective may be rejected. When a sublot is <br /> 19 rejected a minimum of two additional random samples from this sublot will be obtained. I <br /> 20 These additional samples and the original sublot will be evaluated as an independent lot in <br /> 21 accordance with Section 1-06.2(2). <br /> 22 I <br /> 23 5-O4.3(11)F Rejection -A Lot in Progress <br /> 24 The Contractor shall shut down operations and shall not resume HMA placement until such <br /> 25 time as the Engineer is satisfied that material conforming to the Specifications can be I <br /> 26 produced: <br /> 27 <br /> 28 1. When the Composite Pay Factor(CPF) of a lot in progress drops below 1.00 and the I <br /> 29 Contractor is taking no corrective action, or <br /> 30 2. When the Pay Factor(PF) for any constituent of a lot in progress drops below 0.95 <br /> 31 and the Contractor is taking no corrective action, or 111 <br /> 32 3. When either the PFi for any constituent or the CPF of a lot in progress is less than <br /> 33 0.75. <br /> 34I <br /> 35 5-O4.3(11)G Rejection -An Entire Lot(Mixture or Compaction) <br /> 36 An entire lot with a CPF of less than 0.75 will be rejected. I <br /> 37 <br /> 38 5-04.3(12) Joints <br /> 39 <br /> 40 5-O4.3(12)A HMA Joints <br /> 41 I 42 5-04.3(12)A1 Transverse Joints <br /> 43 The Contractor shall conduct operations such that the placing of the top or wearing course is <br /> 44 a continuous operation or as close to continuous as possible. Unscheduled transverse joints I <br /> 45 will be allowed and the roller may pass over the unprotected end of the freshly laid mixture <br /> 46 only when the placement of the course must be discontinued for such a length of time that <br /> 47 the mixture will cool below compaction temperature. When the Work is resumed, the I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 60 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />