My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW Geotech Report 2022-10-25
>
Address Records
>
106TH ST SW
>
2320
>
Geotech Report
>
2320 106TH ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:31:16 PM
Creation date
6/5/2020 11:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 14,2015 <br /> Project No.T-6116-2 <br /> —ie native soils encountered at the site contain a sufficient amount of soil fines that will make them difficult to <br /> compact as structural fill when too wet or too dry. The ability to use native soils from site excavations as <br /> structural fill will depend on its moisture content and the prevailing weather conditions at the time of <br /> construction. If wet soils are encountered,the contractor will need to dry the soils by aeration during dry weather <br /> conditions. Alternatively, the use of an additive such as Portland cement, cement kiln dust (CKD), or lime to <br /> stabilize the soil moisture can be considered. If the soil is amended, additional Best Management Practices <br /> (BMPs) addressing the potential for elevated pH levels will need to be included in the Storm Water Pollution <br /> Prevention Program(SWPPP)prepared with the Temporary Erosion and Sedimentation Control (TESC)plan. <br /> If grading activities are planned during the wet winter months, or if they are initiated during the summer and <br /> extend into fall and winter, the owner should be prepared to import wet weather structural fill. For this purpose, <br /> we recommend importing a granular soil that meets the following grading requirements: <br /> U.S. Sieve Size Percent Passing <br /> 6 inches 100 <br /> No. 4 75 maximum <br /> No. 200 5 maximum* <br /> * Based on the 3/4-inch fraction. <br /> Prior to use, Terra Associates, Inc. should examine and test all materials imported to the site for use as structural <br /> fill. <br /> 11 ctural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of <br /> • percent of the soil's maximum dry density, as determined by American Society for Testing and Materials <br /> (ASTM)Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction <br /> should be within two percent of its optimum, as determined by this ASTM standard. In nonstructural areas, the <br /> degree of compaction can be reduced to 90 percent. <br /> 5.3 Excavations and Shoring <br /> All excavations at the site associated with confined spaces, such as utility trenches, must be completed in <br /> accordance with local, state, and federal requirements. Based on regulations outlined in the Washington <br /> Industrial Safety and Health Act (WISHA), the upper one and one-half to three and one-half feet would be <br /> classified as Type C soil. The native dense till soils would be classified as Type A soil. <br /> Accordingly, temporary excavations in Type C soils should have their slopes laid back at an inclination of 1.5:1 <br /> (Horizontal:Vertical)or flatter, from the toe to the crest of the slope. Side slopes in Type A soils can be laid back <br /> at a slope inclination of 0.75:1 or flatter. For temporary excavation slopes less than 8 feet in height in Type A <br /> soils, the lower 3.5 feet can be cut to a vertical condition, with a 0.75:1 slope graded above. For temporary <br /> excavation slopes greater than 8 feet in height up to a maximum height of 12 feet, the slope above the 3.5-foot <br /> vertical portion will need to be laid back at a minimum slope inclination of 1:1. No vertical cut with a backslope <br /> immediately above is allowed for excavation depths that exceed 12 feet. In this case, a four-foot vertical cut with <br /> an equivalent horizontal bench to the cut slope toe is required. All exposed temporary slope faces that will remain <br /> open for an extended period of time should be covered with a durable reinforced plastic membrane during <br /> =instruction to prevent slope raveling and rutting during periods of precipitation. <br /> Page No. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.