My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2020-06-05
>
Address Records
>
HARDESON RD
>
7000
>
7000 HARDESON RD 2020-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 1:58:07 PM
Creation date
6/5/2020 1:50:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Community Transit Merrill Creek Operating Base <br /> 7100 Hardeson Road <br /> Everett, Washington <br /> February 28, 2018 <br /> RN File No. 3224-002A <br /> Page 5 <br /> Resources Conservation Service (NRCS) to determine the erosion hazard of the on-site soils. <br /> The site surface soils were classified using the SCS classification system as 'Pits'. This unit <br /> consists of areas that have been excavated for sand or gravel. While a corresponding geologic <br /> unit for these soils is not noted, our site explorations encountered advance outwash sand and <br /> gravel. We expect the erosion hazard for the soil on the surrounding slopes to be moderate to <br /> severe depending on the slope inclinations. We have included the soil survey as Appendix A. <br /> Seismic Hazard: It is our opinion based on our subsurface explorations that the Soil Profile in <br /> accordance with the 2015. International Building Code (IBC) is Site Class D with Seismic Design <br /> Category D. We used the US Geological Survey program "U.S. Seismic Design Maps Web <br /> Application." The design maps summary report for the 2012/15 IBC is included in this report in <br /> Appendix B. <br /> Additional seismic considerations include liquefaction potential and amplification of ground <br /> motions by soft soil deposits. The liquefaction potential is highest for loose sand with a high <br /> groundwater table. The underlying dense outwash deposits are considered to have a very low <br /> potential for liquefaction and amplification of ground motion and seismically induced lateral <br /> spread. <br /> The project is mapped on Faults and Earthquakes in Washington State (Jessica L. Czajkowski <br /> and Jeffrey D. Bowman, USGS OFR 2014-05) as located in the Southern Whidbey island fault <br /> zone. This is a class A fault and is considered to have a low potential for surface displacement <br /> because of the thickness of the glacial overburden. The location of the fault zone is shown on <br /> the map in Appendix B. <br /> Site Preparation and Grading <br /> The first step of site preparation should be to strip the asphalt and loose fill soils to expose <br /> medium dense or firmer soils in pavement areas. Because the fill thickness ranges from about <br /> 14 to 19 feet in the pavement replacement areas, it is not feasible to completely remove all fill <br /> material. We therefore recommend approximately 2 feet of existing fill be removed from the <br /> underlying pavement. The excavated material should be removed from the site, or stockpiled <br /> for later use as landscaping fill. The resulting subgrade should be compacted to a firm, non- <br /> yielding condition. Areas observed to pump or yield should be repaired prior to placing hard <br /> surfaces. <br /> The on-site fill likely to be exposed during construction is considered moisture sensitive, and <br /> the surface will disturb easily when wet. We expect these soils would be difficult, if not <br /> impossible, to compact to structural fill specifications in wet weather. We recommend that <br /> earthwork be conducted during the drier months. Additional expenses of wet weather or winter <br /> construction could include extra excavation and use of imported fill or rock spalls. During wet <br /> weather, alternative site preparation methods may be necessary. These methods may include <br /> utilizing a smooth-bucket trackhoe to complete site stripping and diverting construction traffic <br /> around prepared subgrades. Disturbance to the prepared subgrade may be minimized by <br /> placing a blanket of rock spalls or imported sand and gravel in traffic areas. Cutoff drains or <br /> Robinson Noble, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.