My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 1:20:34 PM
Creation date
6/15/2020 11:14:14 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X <br /> 4r161-17v PUBLIC WORKStYI <br /> 40 0 <br /> Pp <br /> MEMORANDUM <br /> TO: Lori Hoover, Barghausen Consulting Engineers, Inc. <br /> Megan Palmer, Barghausen Consulting Engineers, Inc. <br /> FROM: Sabrina Fandler, P.E. I City of Everett Engineering/Permit Services, 425-257-7813 <br /> DATE: 6/21/2018 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site work for expansion of Costco fueling facility <br /> LOCATION: 10200 19th Ave SE <br /> PERMIT#: PW1804-043 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov, or <br /> the other reviewers listed depending on the scope of the question.Please note that these comments <br /> are compiled from Public Works reviewers for the Public Works (civil)plans only. The applicant <br /> team may receive a separate comment letter from the Building Department and/or the Planning <br /> Department for architectural or other types of drawings. <br /> a. Please resubmit the following items to the Permit Services Counter with your resubmittal <br /> onceall quested revisions have been made: <br /> Transmittal Sheet: (1)available at the Permit Counter(and included herein for your <br /> ise upon resubmittal). <br /> . t lans: (3) full size sets of revised plans, plus original City Markups. Plan must be <br /> final drawings for permit issuance. <br /> iii. Drainage Report: (2) copies of revised report. Report must be final report for <br /> i <br /> permit issuance (riot preliminary as previously indicated). <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm (closed between 12:OOpm-1:OOpm for lunch). <br /> Page l of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.