. o <br /> Page 3 of 9 <br /> he main floor framing plan on Sheet S-4.0 indicates Mark"2" hold-downs. The Hold-down <br /> Schedule only includes Mark"1"hold-downs. The design should be reviewed and revised as <br /> needed. See IBC Section 107.2.1. <br /> Response; <br /> The hold-down schedule has been revised to reflect the intended plan notation. <br /> Grid F appears to include multiple wood posts. The sizes of the posts do not appear to be <br /> specified. The drawings should be reviewed and revised as needed. See IBC Section <br /> 1603.1. <br /> Response; <br /> The supplemental information you have requested has been provided in the attached <br /> revised plan sheets. <br /> +,9. The Main Level framing plan on Sheet S-4.0 specifies both 14-inch joists (Plan Note 3) and <br /> 2x8 joists (Plan Note 7) between Grids A-A.5. The extent of each type of framing in this <br /> area should be specified on the plan. See IBC Section 1603.1. <br /> Response: <br /> The clarification you requested is provided in the attached revised plans. <br /> Ail The second story includes shear walls on Grid A that appear to require structural sheathing <br /> at the Main Floor level to transfer loads to Grid A.5. The requirement for sheathing should <br /> be verified and Sheet S-4.0 revised to show the extent of the sheathing between Grids A- <br /> A.5. Verify the sheathing should be installed per Note 2.. See IBC Sections 1603.1 and <br /> 1604.4. <br /> Response; <br /> The -xtent of floor sheathing has been clarified on the attached revised plans <br /> R Detail 5/S-4.1 specifies a"positive connection nailer"to the steel beam. The detail should <br /> be revised to show the required construction of the connection. See IBC Section 107.2.1 <br /> Response; <br /> The supplemental information has been provided on the detail per your request <br /> ✓icz-z'' .4.0, c<4rct A/. <br /> 817 Metcalf Street, Suite 207 Office: 360.855.2333 Ext. 207 <br /> Sedro-Woolley,WA 98284 Cell: 360.982.0928 <br />