My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/04/29 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/04/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:36:28 AM
Creation date
7/1/2020 10:31:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/29/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.10 <br /> EXHIBIT A <br /> Prior to each workshop,AECOM will prepare and distribute an agenda. If there is <br /> available time after the workshops, additional site visits will be conducted, as needed. <br /> After each workshop,AECOM will document decisions made during the workshop in <br /> workshop minutes and distribute to the City for review and concurrence. <br /> It is assumed that three representatives from AECOM will attend each workshop. <br /> Subtask 2.4—Pre-design Development and Planning-level Construction Cost Estimates <br /> AECOM will leverage information gathered and decisions made during the documents <br /> review, tabletop study, kick-off meeting, workshop(s), and site visit to develop 15% <br /> design drawings for the selected upgrade alternatives. The 15% design drawings will <br /> include building plans with seismic mitigation keynotes, mitigation alternates for each <br /> identified deficiencies, mitigation standard details, as well as proposed construction <br /> materials. Where appropriate, up to two (2)mitigation alternates will be developed for <br /> each identified major structural deficiencies,as needed. <br /> AECOM will prepare planning-level construction cost estimates for selected upgrade <br /> alternatives that will be submitted with the 15% design drawings. Cost estimates will be <br /> based on previous AECOM project bids with similar work elements, previous City project <br /> costs with similar work elements, cost quotes provided by contractors upon request from <br /> AECOM, and unit costs from cost guide books (RS Means). <br /> Subtask 2.5—Pre-design Memorandum <br /> AECOM will prepare a technical memorandum entitled "Pre-Design Evaluation for Water <br /> Filter Plant Operations Building: Structural and Nonstructural Seismic Retrofit." The <br /> memorandum will consist of the following primary elements: <br /> • Introduction <br /> • Project Description <br /> • Level of Structural Investigation <br /> • Documentation reviewed <br /> • Structural Retrofit Recommendations <br /> o Design criteria <br /> o ASCE 41-13 Tier-1 Structural and nonstructural checklist <br /> o Recommended mitigation alternates and associated mitigation costs <br /> • Prioritize mitigation recommendations based on City's project objectives <br /> • Conclusions <br /> The memorandum will be submitted to the City for review. The memorandum will be <br /> finalized, after City comments are received by AECOM. <br /> Task 2 Deliverables: <br /> • Criteria Memorandum (brief) <br /> • Kick-off Meeting Agenda/Minutes <br /> • Workshop Agenda/Minutes <br /> • 15% Design Drawings <br /> • Planning-level Construction Cost Estimates <br /> • Pre-design Memorandum (Draft and Final) <br /> J:\Projects\E\Everett,City of\Operations Building Seismic Upgrade\Project Management\Scoping\revised 03-18- <br /> 1512 Draft Scope of Work_Operations Bid Seismic Upgrade 04-14-15.docx <br /> Page 4 of 8 <br /> 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.