Laserfiche WebLink
has taken place regarding this issue. Coordination shall take place as needed (Rick <br /> Osborne, ROsborne@everettwa.gov, 425-257-7230). <br /> PORT RESPONSE: These have been incorporated into our plans and where we <br /> were not able to, discussed with Rick and Jane. <br /> 3. The comments below were generated from this project's Stormwater Reviewer. If you have <br /> any questions regarding these comments, please contact Jane Zimmerman with the City of <br /> Everett Public Works Department (425-257-8885 or JZimme,man@everettwa.gov). <br /> a. Drainage Report: <br /> i. Please see the attached markups for the drainage report and update <br /> accordingly for your resubmittal. <br /> PORT RESPONSE: Done, please see drainage report for edits <br /> b. Civil Plans: <br /> i. General: <br /> 1. For clarity, please only include the construction notes on each plan <br /> that actually pertain to the given plan. <br /> PORT RESPONSE: For consistency in Construction Note numbers across the <br /> sheets, notes not applicable to a particular sheet have been replaced with "Not <br /> Used". <br /> Construction note 4— is City Standard Drawing No. 616 really <br /> applicable in this case? <br /> PORT RESPONSE: Reference to City Std Dwg No. 616 has been removed and <br /> replaced with appropriate text. <br /> ii. SV-04: <br /> 1. Please provide complete and accurate as-builts of the portion of the <br /> Riverside Road drainage system indicated by the red line in the "snip" <br /> below. Field observation indicates that the provided information is <br /> inaccurate and incomplete. <br /> PORT RESPONSE:These will be added to the final as-builts for the project. They <br /> will need to be surveyed and located appropriately. <br /> ti <br /> R R -.S <br /> r..--- <br /> aZ <br /> • �t <br />