Laserfiche WebLink
a <br /> Ordinance No. <br /> AN ORDINANCE creating a special improvement project entitled"Howarth Park <br /> Pedestrian Bridge Repair",Fund 354,Program 045,to accumulate all costs for the <br /> improvement project. <br /> WHEREAS,the City of Everett is committed to a planned parks capital improvement <br /> program as a part of the City of Everett Parks&Recreation Comprehensive Plan; and <br /> WHEREAS,as part of the Everett Parks&Recreation Department's periodic inspection <br /> of the Howarth Park Pedestrian Bridge; structural degradation of certain bridge <br /> components was identified; and <br /> WHEREAS,the Howarth Park Pedestrian Bridge was closed on May 14,2015 pending <br /> repair of certain bridge components; and <br /> .WHEREAS,funding is necessary to design, engineer and construct the work necessary <br /> to repair the Howarth Park Pedestrian Bridge;and <br /> WHEREAS,the City of Everett is requesting funding approval for the utilization of <br /> Capital Improvement Program 3 (CIP 3)funds to design, engineer and construct the work <br /> necessary to repair to the Howarth Park Pedestrian Bridge; <br /> NOW,THEREFORE,THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 354, Program 045, and shall <br /> be entitled"Howarth Park Pedestrian Bridge Repair"to accumulate all costs for the <br /> improvement project. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund <br /> 354,Program 045, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted to the Parks and Recreation Director, under the direction <br /> of the Mayor, to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the action authorized in this ordinance. <br /> 10 <br />