Laserfiche WebLink
STORMWATER SITE PLAN May 10,2017 <br /> OAKES AVENUE APARTMENTS PAGE 15 <br /> MR 3: WATER POLLUTION SOURCE CONTROL <br /> CONSTRUCTION STORMWATER BMPs <br /> A Storm Water Pollution Prevention Plan, SWPPP, is part of the construction drawings prepared <br /> for the project, and includes the following erosion control Best Management Practices: <br /> The construction staging area shall occur on-site. <br /> High Visibility Fencing (BMP C103) <br /> Use in combination with BMP C233, silt fence as indicated on the plans. <br /> Construction Road/Parking Area Stabilization (BMP C107) <br /> Once demolition is complete, the building foundations and slab areas will be stabilized with <br /> gravel and concrete along with the proposed parking along the alley. <br /> Temporary& Permanent Seeding (BMP C120) <br /> Permanent seeding shall be used to stabilize exposed soils and shall be performed under the <br /> direction of the landscape plans and specifications. <br /> Mulching (BMP C121) <br /> Stabilize exposed surfaces with 4" sterile straw mulch when surfaces are to be unworked for <br /> the seasonal time frames listed in the TESC Notes and SWPPP Narrative. <br /> Plastic Covering (BMP C123) <br /> Use plastic sheathing to protect stockpiles. Stabilize with sand bags connected with rope. <br /> Topsoiling/Composting (BMP C125) <br /> Topsoil proposed planters as noted. <br /> Dust Control (BMP C140) <br /> Contractor shall implement measures to prevent wind transport of dust from soil surfaces. Such <br /> measures can include but are not limited to the following: mulching areas not used for vehicle <br /> access, reducing speeds on haul roads, sprinkle exposed surfaces with water, surface haul roads <br /> with gravel. <br /> Storm Inlet Protection (BMP C220) <br /> Place inserts per plan detail in existing catch basins as indicated on the plan. <br /> As new catch basins are installed, these shall also be protected until the drainage area is <br /> stabilized. <br /> Silt Fence (BMP C233) <br /> P:1Work(Share ii le)\Projects\20 k 6\16-203 Rainier Building Co\CE DOCS\Drain\2017 05 10 16-205 Oakes 1)raiu Rpt.doe <br />