My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained on-site or within reasonable access to the <br /> site. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of <br /> the state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state <br /> regulatory authority, it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems <br /> identified. Revisions to the SWPPP shall be completed within seven (7) <br /> days following the inspection. <br /> 3.2 Site Specific BMPs <br /> Site specific BMPs are shown on the TESC Plan Sheets and Details in Appendix A. These site <br /> specific plan sheets will be updated annually. <br /> 3.3 Additional Advanced BMPs <br /> The BMP implementation schedule will be driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> The BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such,the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Mobilize and store all ESC and soil stabilization products: 3/18/16 <br /> • Install ESC measures: 3/21/16 <br /> • Install stabilized construction entrance: 3/21/16 <br /> • Begin clearing and grubbing: N/A <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.