Stormwater Pollution Prevention Plan <br /> The BMP implementation schedule is driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such,the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Estimate of Construction start date: 03 / 18/2016 <br /> • Estimate of Construction finish date: 04/29/2016 <br /> • Mobilize equipment on site: 03 / 18/2016 <br /> ■ Install ESC measures: 03 / 18 /2016 <br /> ■ Install stabilized construction entrance: 03 / 18 /2016 <br /> • Begin Stockpile: 03 / 18 /2016 <br /> • Seed(soil and slope stabilization): 04/29/2016 <br /> 20 <br />