Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IThe unit price per each manhole shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract <br /> Documents. <br /> IThe unit price per each manhole shall be full compensation for furnishing, hauling, and <br /> assembling in place the completed installation including all manholes, frames and covers, <br /> 1 pipe connections, special fittings, and joint materials up to a depth of 10-ft as measured from <br /> the flowline of the outlet pipe to the surface of the Work measured to the nearest foot. <br /> The unit price of per each manhole shall also include, but not be limited to, all costs for <br /> I excavation; hauling and disposing of surplus or unsuitable material; dewatering; sewer flow <br /> bypassing; furnishing and installing couplings; furnishing and installing steps or ladder; <br /> placing and compacting native backfill; furnishing, placing, and compacting foundation <br /> I material as required; cleaning and flushing manholes; reconnecting existing sanitary sewer <br /> connections; and replacing, protecting and maintaining utilities. <br /> All costs associated with abandoning and/or removing and disposing of existing manholes <br /> I as shown on the plans shall be included in the unit price for this bid item. <br /> Adjusting new manhole rings and covers to final grade shall be included in the unit price for <br /> this bid item. <br /> IInstallation of field-formed concrete channels and benches inside all manhole bases shall be <br /> included in this bid item. Pre-cast or pre-formed channel bases are not acceptable. <br /> I The cost of connection of pipes to the manhole is incidental and shall be included in the unit <br /> price for this bid item. <br /> Measurement shall be per each manhole installed as measured upon completion. <br /> IBid Item 26: Combined Sewer Manhole, Saddle Manhole, 84-inch DIA. <br /> Measurement and Payment: Unit Price per Each (EA) <br /> I The unit price per each manhole shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract <br /> Documents. <br /> 111 The unit price per each manhole shall be full compensation for furnishing, hauling, and <br /> assembling in place the completed installation including all manholes, frames and covers, <br /> pipe connections, special fittings, and joint materials. <br /> IThe unit price of per each manhole shall also include, but not be limited to, all costs for <br /> excavation; hauling and disposing of surplus or unsuitable material; dewatering; sewer flow <br /> bypassing; furnishing and installing couplings; grouting, furnishing and installing steps or <br /> Iladder; placing and compacting native backfill; furnishing, placing, and compacting <br /> foundation material as required; cleaning and flushing manholes; reconnecting existing <br /> sanitary sewer connections; and replacing, protecting and maintaining utilities. <br /> IAll costs associated with removing and disposing of existing pipe as shown on the plans shall <br /> be included in the unit price for this bid item. <br /> I Adjusting new manhole ring and cover to final grade shall be included in the unit price for this <br /> bid item. <br /> Installation of field-formed concrete channels and benches inside manhole base shall be <br /> Iincluded in this bid item. Pre-cast or pre-formed channel bases are not acceptable. <br /> I Sewer 0 Division B—BID DESCRIPTIONS April,2020 <br /> WO No.—UP3691 SP-9 <br /> 1 <br />