My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The cost of connection of pipes to the manhole is incidental and shall be included in the unit I <br /> price for this bide item. <br /> Measurement shall be per each manhole installed as measured upon completion. <br /> Bid Item 27: Combined Sewer Manhole,48-inch DIA, Additional Height <br /> Bid Item 28: Combined Sewer Manhole, 60-inch DIA, Additional Height <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> In addition to the measurement per each, manhole in excess of 10 feet in height will be <br /> measured per linear foot for each additional foot of total height over 10 feet as measured I <br /> from the flow line to the surface of the Work. <br /> The unit price per linear foot shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in these Contract I <br /> Documents. <br /> Measurement of manhole height for payment purposes shall be the distance from the flowline <br /> of the outlet pipe to the surface of the Work measured to the nearest foot. <br /> Bid Item 29: Side Sewer Replacement <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each side sewer replacement shall be full compensation for all labor, <br /> material, tools and equipment necessary to satisfactorily complete the work as defined in <br /> Section 7-18 of these Special Provisions and as shown on the Plans. <br /> Included in this bid item is locating the existing side sewer, replacing the side sewer as shown <br /> on the Contract Plans, connection to the main pipe and existing side sewer, fittings per COE <br /> Standard Drawings. Included in this bid item is the work to locate side sewers near the I <br /> property line, including depth of utility, prior to installing tees at the main. <br /> Included in this bid item are all costs for trench excavation, removing and disposing of <br /> pavement sidewalk, curb, miscellaneous surfacing, landscape materials or sod, removing I <br /> and disposing of existing side sewer pipe; hauling and disposing of surplus or unsuitable <br /> materials; excavation; backfill; dewatering; sewage bypassing; stockpiling, hauling, cleaning <br /> and flushing pipes;testing and inspecting and replacing; protecting and maintaining adjacent I <br /> utilities. <br /> Included in this bid item is installation of backwater valves where shown on the plans. <br /> Backwater valves will be furnished by the City for installation by the contractor. I <br /> All costs in jointing dissimilar side sewer pipe with a coupling shall be included in the unit <br /> price for this bid item. <br /> Restoration of private improvements in streets and private property affected by side sewer I <br /> construction and not otherwise included in other bid items, shall be considered incidental to <br /> this bid item. <br /> Bid Item 30: Temporary Bypass Pumping <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid item for Temporary Bypass Pumping shall be full compensation for , <br /> materials, work, labor and equipment necessary to furnish, install, and maintain temporary <br /> facilities necessary to maintain the continual combined sewer flow and to prevent wastewater <br /> discharge to the environment throughout the duration of constructing new or rehabilitating <br /> existing sanitary sewer or combined sewer mains, or both, within the Project. The lump sum <br /> price shall be full compensation for all materials, tools, labor and equipment necessary to <br /> Sewer 0 Division B—BID DESCRIPTIONS April,2020 I <br /> WO No.—UP3691 SP-10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.