My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Iand payment limits for measuring the width of this bid item shall not exceed the saw-cut limits <br /> shown on the Drawings. No deduction will be made for the weight of asphalt binder, blending <br /> sand, mineral filler, or other component of the mixture. <br /> IThe unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform density tests on multiple lifts <br /> of HMA— CL 1/2" PG 64-22 pavement including streets, alleys, and street crossings, as <br /> Ishown on the Plans. <br /> Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be <br /> included in this bid item with no direct compensation made. All costs for "Anti Stripping <br /> I Additive" and "Compaction Adjustment"shall be included in the unit contract price per ton of <br /> the HMA with no direct compensation made. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> I <br /> necessary to furnish, place, compact, roll and perform density tests on ATB placed in <br /> accordance with the Plans, Standard Specifications, and these Special Provisions. <br /> Bid Item 40 &99: Planing Bituminous Pavement (2" Deep) <br /> IMeasurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Planing Bituminous Pavement (2" Deep) shall be per square yard as <br /> delineated by the Contractor and approved by the Inspector. The unit price for this bid item <br /> I shall be full payment for all costs incurred to perform the Work described in Section 5- <br /> 04.3(14), to complete the work in accordance with the Plans, COE Standard Drawings, <br /> Standard Specifications and these Special Provisions. <br /> I <br /> Bid Item 41 & 100: Cement Concrete Sidewalk Restoration <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> 1 Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete sidewalks shall be full <br /> compensation for final sawcut and all materials, tools, labor and equipment necessary to <br /> I <br /> complete the work in accordance with the Plans, COE Standard Drawings, Standard <br /> Specifications and these Special Provisions. <br /> Bid Item 42: Cement Concrete Driveway Restoration <br /> IMeasurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> I <br /> Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete driveways shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> I <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications, and these <br /> Special Provisions. Removal and disposal of existing driveway and base materials is also <br /> included in this item. Crushed surfacing top course placed under driveway is incidental to <br /> the driveway restoration item. <br /> IBid Item 43: Cement Concrete Curb and Gutter, Type A-1 <br /> Measurement and Payment: Unit Price per Linear Foot(LF) <br /> 1 Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for restoration of concrete curbs or curb and gutter and shall be <br /> I full compensation for all materials, tools, labor and equipment necessary to complete the <br /> Work in accordance with the Plans, COE Standard Drawings, Standard Specifications and <br /> these Special Provisions, including sawcutting, removal, loading, hauling and disposal. <br /> I <br /> Sewer 0 Division B—BID DESCRIPTIONS April,2020 <br /> WO No.—UP3691 SP-13 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.