Laserfiche WebLink
3. As needed, procure and coordinate the activities of subconsultants providing specialized <br /> services. Any subconsultant work identified will be funded from Task 7 -Additional Services <br /> during Procurement, Design and Construction Phases. <br /> 4. Conduct QA reviews of Consultant deliverables. <br /> Deliverables: <br /> • Project Development Schedule <br /> • Monthly progress reports (assume 6)and invoices <br /> Task 2 CPARB Approval Process, FEE= $10,122 <br /> Objective:To support the City in securing approval from the CPARB Project Review Committee (PRC). <br /> Scope: <br /> This scope is based on the City taking the lead to secure PRC approval, and preparing the draft and <br /> final CPARB applications. The budget for this scope is set at a $10,000 allowance to engage in <br /> support activities requested by the City such as: <br /> 1. Application: Attendance at meetings in Everett with the City to discuss information gaps and <br /> the overall approach taken in the City's preliminary application. Review the City's final <br /> application prior to the City submitting the document to the PRC. Provide supplemental <br /> project graphics that are needed to sufficiently communicate the nature of the project to the <br /> PRC. <br /> 2. PRC Presentation: Assist the City by preparing presentation materials and participate in the <br /> PRC project review meeting. <br /> Deliverables(as requested by the City): <br /> • Review draft and final PRC applications <br /> • Project graphics to be used in application and presentation <br /> • Review and assist with City's development of PRC presentation materials <br /> Task 3 Procurement Strategy Workshop/ Follow-up with Legal Department, FEE=$10,620 <br /> Objective: To establish an overall approach to the procurement process and to the structuring of the <br /> progressive DB work. <br /> Scope: <br /> The Consultant will participate in a 2-hour workshop with City staff to establish the overall approach <br /> and framework for the procurement and for structuring the work to be completed by the Design- <br /> Builder. During the workshop, the City and Consultant will prepare materials to support the <br /> procurement process including schedule; RCW 39.10 PDB procurement compliance checklist; and <br /> draft term sheet describing contract terms such as payment, warrantees and guarantees, liquidated <br /> damages and incentives. The scope assumes the City will provide meeting space for the workshop. <br />