Laserfiche WebLink
1 8-03.5.OPT1.DOCX <br /> 2 (******) I <br /> 3 "Irrigation System Complete", lump sum. <br /> 4 The lump sum Contract price for"Irrigation System Complete" shall be full compensation <br /> 5 for all costs incurred by the Contractor in providing a complete and restored irrigation I <br /> 6 system to affected areas, as specified, including furnishing all materials necessary for a <br /> 7 complete design and installation, including wire, sleeves, pipe, valves, fittings, heads, <br /> 8 nozzles, controller, back-flow prevention device, and all appurtenances related thereto. I <br /> 9 Included shall be all labor of design and installation, including trenching, plumbing, back- <br /> 10 filling, electrical Work, adjustments, and all other items of labor necessary for a <br /> 11 satisfactory operating system. <br /> 12 <br /> 13 8-12.GR8 <br /> 14 Chain Link Fence and Wire Fence <br /> 15 ' <br /> 16 8-12.1.DOCX <br /> 17 Description <br /> 18 <br /> 19 8-12.1.INST1.DOCX <br /> 20 Section 8-12.1 is supplemented with the following: <br /> 21 <br /> 22 8-12.1.OPT1.DOCX <br /> 23 (******) <br /> 24 This Work consists of providing and installing temporary chain link fence. <br /> 25 <br /> 26 8-12.3.GR8 <br /> 27 Construction Requirements <br /> 28 <br /> 29 8-12.3(1).DOCX <br /> 30 Chain Link Fence and Gates <br /> 31 <br /> 32 8-12.3(1),INST1.DOCX <br /> 33 Section 8-12.3(1) is supplemented with the following: <br /> 34 <br /> 35 8-12.3(1).OPT1.DOCX <br /> 36 (******) <br /> 37 Temporary Chain Link Fencing <br /> 38 Temporary chain link fencing shall be of a movable and freestanding commercial type <br /> 39 of the height shown in the Plans. Fencing shall be joined together at all joints and <br /> 40 come equipped with footing supports for fencing stability. The Contractor shall be <br /> 41 responsible for placing and adjusting fencing as necessary during the course of Work I <br /> 42 as required. When the fencing is no longer required and as approved by the <br /> 43 Engineer, the Contractor shall remove the temporary fencing from the project site. <br /> 44 <br /> 45 8-12.4.DOCX <br /> 46 Measurement <br /> 47 1 <br /> 1 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 104 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />