Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-12.4.INST1.DOCX <br /> 2 Section 8-12.4 is supplemented with the following: <br /> 3 <br /> 4 8-12.4.OPT1.DOCX <br /> 5 (******) <br /> 6 Temporary chain link fence will be measured by the linear foot along the ground line of <br /> 7 fencing actually provided. <br /> 8 <br /> 9 8-12.5.DOCX <br /> 10 Payment <br /> Ill <br /> 12 8-12.5.INSTI.DOCX <br /> 13 Section 8-12.5 is supplemented with the following: <br /> ' 14 <br /> 15 8-12.5.OPTI.DOCX <br /> 16 (******) <br /> 17 "Temporary Chain Link Fence", per linear foot. <br /> 18 The unit Contract price per linear foot for"Temporary Chain Link Fence" shall be full pay <br /> 19 for furnishing and installing temporary fencing, intermediate adjustments, and removal of <br /> 20 fencing, along with all costs associated with the furnishing, installing, and removing, <br /> 21 including the cost of equipment and materials, HMA curb abutment, as shown in the <br /> 22 Plans. <br /> 23 <br /> 24 8-SA1.DOCX <br /> 25 (******) <br /> 26 ROCK SLOPE PROTECTION <br /> 27 Description <br /> 28 This work shall consist of shaping the slope and furnishing and placing the rock under the <br /> 29 west end of the Maple Heights Bridge as shown in the Plans. <br /> I 30 <br /> 31 Materials <br /> 32 The rock slope protection will meet the requirements of Section 9-13.4, "Class A Rock for <br /> ' 33 Erosion and Scour Protection". <br /> 34 <br /> 35 Construction Requirements <br /> 36 The rock slope protection shall be placed in an even, continuous layer. The minimum layer <br /> 37 thickness shall be 18 inches. The rock slope protection shall be placed utilizing heavy <br /> 38 equipment and be tamped into place. The sequences of rock placement shall begin at the <br /> 39 base of the slope and work upward. <br /> I 40 <br /> 41 The existing gabion west of Pier 1 shall be used to retain the rock in place. New gabion shall <br /> 42 be constructed adjacent to the existing gabion and will extend to one foot past the drip line of <br /> 43 the bridge. <br /> 44 <br /> 45 New gabion shall match the existing gabion and shall follow the requirements in Section 8- <br /> ' 46 24.3(3). <br /> 47 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 105 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.