My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting I <br /> 2 Agency before the time set for receipt of Bid Proposals. <br /> 3 I 4 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 5 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> 6 unopened Proposal package to the Bidder. The Bidder must then submit the revised or I <br /> 7 supplemented package in its entirety. If the Bidder does not submit a revised or <br /> 8 supplemented package, then its bid shall be considered withdrawn. <br /> 9 <br /> 10 Late revised or supplemented Bid Proposals or late withdrawal requests will be date I <br /> 11 recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> 12 requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> 13 1 14 1-02.13.RTF <br /> 15 1-02.13 Irregular Proposals <br /> 16 (December 19, 2019 APWA GSP) <br /> 17 <br /> 18 Delete this section and replace it with the following: <br /> 19 <br /> 20 1. A Proposal will be considered irregular and will be rejected if: <br /> 21 a. The Bidder is not prequalified when so required; <br /> 22 b. The authorized Proposal form furnished by the Contracting Agency is not <br /> 23 used or is altered; <br /> 24 c. The completed Proposal form contains any unauthorized additions, deletions, <br /> 25 alternate Bids, or conditions; <br /> 26 d. The Bidder adds provisions reserving the right to reject or accept the award, <br /> 27 or enter into the Contract; <br /> 28 e. A price per unit cannot be determined from the Bid Proposal; <br /> 29 f. The Proposal form is not properly executed; <br /> 30 g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> 31 applicable, as required in Section 1-02.6; <br /> 32 h. The Bidder fails to submit or properly complete an Underutilized I <br /> 33 Disadvantaged Business Enterprise Certification, if applicable, as required in <br /> 34 Section 1-02.6; <br /> 35 i. The Bidder fails to submit written confirmation from each UDBE firm listed on <br /> 36 the Bidder's completed UDBE Utilization Certification that they are in <br /> 37 agreement with the bidder's UDBE participation commitment, if applicable, as <br /> 38 required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> 39 to meet the requirements of the Special Provisions; <br /> 40 j The Bidder fails to submit UDBE Good Faith Effort documentation, if <br /> 41 applicable, as required in Section 1-02.6, or if the documentation that is <br /> 42 submitted fails to demonstrate that a Good Faith Effort to meet the ConditionII <br /> 43 of Award was made; <br /> 44 k. The Bidder fails to submit a UDBE Bid Item Breakdown form, if applicable, as <br /> 45 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 46 meet the requirements of the Special Provisions; <br /> 47 I. The Bidder fails to submit UDBE Trucking Credit Forms, if applicable, as <br /> 48 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 49 meet the requirements of the Special Provisions; <br /> 50 m. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> 51 the material terms of the Bid invitation; or <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 8 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.